A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.
Whatever prompted you to look into a single-storey extension, whether wear and tear, a growing family or plans to move, we can survey your Worcester home and give you a price in writing. Homes in the West Midlands typically come in at £34,500–£74,000, VAT included, for this kind of work. We also cover Droitwich, Great Malvern and Stourport-on-Severn, and the same steps apply wherever you are in Worcestershire.
- Guide price
- £34,500–£74,000 inc VAT
- Time on site
- 10–16 weeks on site
- Postcodes
- WR1, WR2, WR3, WR4 and WR5
- Planning rules
- England
- Local area
- Worcestershire
- Survey
- Free, with a written quote
What should you budget for a single-storey extension in Worcester?
To help you plan, we show what a single-storey extension typically costs in Worcester instead of holding figures back for a sales call. The range is £34,500–£74,000 with VAT, using rates in the West Midlands that are about 2% below the national guide. A free survey then fixes your actual price.
| Type of job | What it usually involves | Guide in Worcester |
|---|---|---|
| Small extension (8–12m²) | A modest rear or side extension, such as a utility room or a slightly larger kitchen. | £21,500–£39,000 |
| Typical rear extension (15–25m²) | A kitchen-diner or family room with bifold doors and a rooflight or lantern. | £34,500–£74,000 |
| Large or wrap-around (30m² plus) | A wrap-around or wide rear extension, often with structural steelwork into the house. | £69,000–£127,000 |
Expect these to shape the final quote:
- Roof type, rooflights, lanterns and the amount of glazing
- Ground conditions, foundation depth and drains to divert
- Steelwork needed to open into the existing house
- Finishes, kitchen, flooring and heating specification
What do you get?
- Groundworks, foundations and below-ground drainage
- Cavity walls built and insulated to building regulations
- Flat or pitched roof, with rooflights or a lantern if specified
- Steel beams to open into the existing house
- Electrics and plumbing by qualified trades, with certificates
- Plastering, screed floor and internal doors
Homes in Worcestershire
Worcester has Georgian and Victorian streets and interwar suburbs, black-and-white timber framing survives in many villages, and Malvern has Victorian villas, some built in Malvern stone. Redditch was expanded as a new town from the 1960s, Kidderminster has carpet-era terraces, and Bromsgrove and Evesham mix older centres with newer estates.
Timber-framed and stone buildings call for lime plaster and careful repairs. Terraces suit loft conversions and rear extensions, and new-town homes often take window, roofline and cladding renewal.
Building traditions across Worcestershire also raise conservation and planning questions, so we check those for a single-storey extension in Worcester at the survey stage.
Planning and building rules in Worcester
Because Worcester falls under England's rules, the guidance below is the version relevant to you. Before sending a price, we check your property's position with the council.
In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.
Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a single-storey extension so the price reflects your home.
Written quote
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Getting ready
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a single-storey extension are in place before the first day on site.
The work itself
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
Working with SK Home Improvements
Common questions
Can we stay at home during the build?
Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.
What does a typical extension build look like week by week?
A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.
Is the price fixed?
Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.
How long will a single-storey extension take?
On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Is a flat roof or a pitched roof better on an extension?
A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.
Nearby towns
Coverage for Worcester spans WR1, WR2, WR3 and WR4. Close by, Droitwich, Great Malvern and Stourport-on-Severn are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

