England · Roofing & Cladding

Cladding in Herefordshire

Typical time on site: 3 days to 3 weeks depending on area. Guide price in Herefordshire: £4,900–£12,000 including VAT.

Charcoal composite cladding on the upper storey of a house extension

Free survey in Herefordshire

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Cladding is a protective outer layer of boards or panels, such as timber, composite, fibre cement or uPVC, fixed to battens on the outside of a wall to change its appearance, shed rain and, where insulation is added, reduce heat loss.

Our guide for cladding in the West Midlands comes to £4,900–£12,000 with VAT added, and that range applies across Herefordshire, including Hereford, Leominster, Ross-on-Wye and Ledbury. Your own price depends on the size of the job, the specification and how easy it is to work on the site. We survey for free, check any consents needed under the rules in England, and then put the price in writing.

Guide price
£4,900–£12,000 inc VAT
Time on site
3 days to 3 weeks depending on area
Planning rules
England
Price level
About 2% below the national guide
Towns listed
4
Survey
Free, with a written quote

Cladding prices in Herefordshire

What will cladding cost in Herefordshire? Our guide range is £4,900–£12,000 including VAT. That figure is adjusted for the West Midlands, about 2% below the national guide, and is intended for planning a budget. A firm written price for your chosen specification follows a free survey at your home.

Type of jobWhat it usually involvesGuide in Herefordshire
Feature area or dormerA gable, dormer, bay or small feature wall in uPVC, timber or composite.£1,450–£4,900
Extension or upper storeyAbout 40–60m² of timber, composite or fibre cement with membrane and battens.£4,900–£12,000
Whole houseCladding most elevations of a house, often with added insulation.£12,000–£29,500

Your price depends mostly on:

  • Wall area to be clad and the height of the building
  • Insulation behind the cladding
  • Window reveals, corners and roof junctions to detail
  • Scaffolding, access and distance from boundaries

What’s included?

  • Survey of the wall, boundaries, damp and window details
  • Scaffolding or access towers as needed
  • Breather membrane and treated battens fixed to the wall
  • Insulation behind the cladding where agreed
  • Cavity barriers and fire-stopping where regulations require
  • Cladding boards fixed with suitable stainless or coated fixings
Softwood timberTreated or thermally modified softwood boards with a natural look that weathers to silver.
Hardwood timberCedar, larch or oak boards that are naturally durable and attractive.
CompositeLow-maintenance boards made from wood fibre and plastic, in consistent colours.
Fibre cementNon-combustible boards that resist rot and pests, in painted or woodgrain finishes.

Housing across Herefordshire

Herefordshire is known for black-and-white timber-framed buildings, especially in villages around Weobley, Pembridge and Eardisland. Old Red Sandstone is used widely in churches, farmhouses and walls, Hereford has Victorian terraces and interwar suburbs, and market towns such as Leominster, Ledbury and Ross-on-Wye mix historic centres with newer estates.

Timber-framed and sandstone properties often need lime plaster, breathable finishes and careful roof repairs. Town terraces suit loft conversions and rear extensions, and rural homes commonly add porches, driveways and fencing.

A mild, rural county with frost-prone valleys; the Wye and Lugg flood regularly, so ground levels and drainage matter for outdoor work.

Do you need permission in Herefordshire?

Each UK nation sets its own consent rules, and Herefordshire is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

In England, re-rendering or cladding a house is often allowed without planning permission, but stone, render, timber, plastic or tile cladding is not permitted development in conservation areas, and listed buildings need consent.

If you render or re-clad more than 25% of an external wall, Building Regulations usually require the wall’s insulation to be improved where that is practical, and building control should be notified.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about cladding.

  2. Price and scope agreed

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for cladding.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. Finish and handover

    Our trades complete cladding while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

How we work

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

Can you clad over existing render or brick?

Cladding is usually fixed over existing render or brick using battens, as long as the wall is sound and dry. Loose render may need removing first so the fixings hold. The battens create a ventilated gap so any moisture can drain and dry. We check the wall during the survey and explain any preparation needed before cladding.

Do you cover Hereford, Leominster and Ross-on-Wye?

Yes. As well as Herefordshire, we cover Hereford, Leominster and Ross-on-Wye and the rest of Herefordshire. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.

Are there fire-safety rules for cladding?

Building regulations limit the fire-spread performance of cladding on walls close to a boundary and on taller buildings, which can rule out some timber or composite products in those positions. Cavity barriers behind the cladding also help stop fire spreading through the gap. Fibre cement is non-combustible. We check boundary distances and product data before recommending a material.

How much does house cladding cost?

Cladding around 40–60m² of wall, such as an extension or upper storey, costs £4,900–£12,000, including membrane, battens and trims. As a guide, allow roughly £80–£180 per square metre plus fixed costs for scaffolding and set-up. uPVC and softwood sit at the lower end, while hardwood, composite and fibre cement cost more. Adding insulation increases the price. We confirm a fixed figure after the survey.

How long will cladding take?

On a typical home, allow 3 days to 3 weeks depending on area. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Towns in Herefordshire

Find your town below. Every place listed in Herefordshire is covered for cladding, with the same survey, written quote and fixed-price process.

Planning cladding in Herefordshire?

Not sure of your budget yet? Try our guide-price tool for cladding, then book a free survey in Herefordshire when you want a firm figure.

Call freeFree quote