A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
From Hereford, Leominster, Ross-on-Wye and Ledbury to the quieter corners of Herefordshire, homeowners can book a free survey for a whole-house renovation. We look at the building, agree the scope, then send a quote in writing that fixes the cost of that scope. Work follows the rules for England, and our published range for the West Midlands, £44,000–£118,000 with VAT, gives you a sense of budget before we visit.
- Guide price
- £44,000–£118,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Planning rules
- England
- Price level
- About 2% below the national guide
- Towns listed
- 4
- Survey
- Free, with a written quote
Whole-house renovations prices in Herefordshire
Use the table to gauge the cost of a whole-house renovation in Herefordshire before we visit. Figures include VAT and are scaled for the West Midlands, coming out about 2% below the national guide, which gives £44,000–£118,000 overall. After a free survey, you receive a fixed written price.
| Type of job | What it usually involves | Guide in Herefordshire |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £14,500–£44,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £44,000–£118,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £98,000–£176,000 |
The main things that change the figure:
- Size of the house and number of rooms being renovated
- Whether rewiring, new heating and full replastering are needed
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
What do you get?
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Heating and plumbing upgrades by qualified engineers
- Plastering, skimming and repairs to ceilings and walls
- New kitchen and bathroom fitted to your chosen specification
Homes in Herefordshire
Herefordshire is known for black-and-white timber-framed buildings, especially in villages around Weobley, Pembridge and Eardisland. Old Red Sandstone is used widely in churches, farmhouses and walls, Hereford has Victorian terraces and interwar suburbs, and market towns such as Leominster, Ledbury and Ross-on-Wye mix historic centres with newer estates.
Timber-framed and sandstone properties often need lime plaster, breathable finishes and careful roof repairs. Town terraces suit loft conversions and rear extensions, and rural homes commonly add porches, driveways and fencing.
A mild, rural county with frost-prone valleys; the Wye and Lugg flood regularly, so ground levels and drainage matter for outdoor work.
Planning and building rules in Herefordshire
Because Herefordshire falls under England's rules, the guidance below is the version relevant to you. Before sending a price, we check your property's position with the council.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
Survey and measure
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.
Written quote
The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.
Booking the work
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.
On site to finish
The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.
How we work
Questions about a whole-house renovation in Herefordshire
How long does a full house renovation take?
A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.
How much does it cost to renovate a whole house?
A full refurbishment of a typical 3-bed house costs £44,000–£118,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
Do I need planning permission in Herefordshire?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Herefordshire is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
How much will a whole-house renovation cost in Herefordshire?
As a guide, expect to pay £44,000–£118,000 including VAT for a whole-house renovation in Herefordshire. That range is adjusted for the West Midlands, which runs about 2% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.