A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
Addresses across BT23 fall within our coverage for a double-storey extension, so if your home is in Newtownards we can arrange a survey on a day that works for you. We inspect the existing building, discuss materials and layout, and then price the agreed specification in writing. Expect a guide range of £52,000–£103,000 including VAT before that visit.
- Guide price
- £52,000–£103,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- BT23
- Planning rules
- Northern Ireland
- Local area
- Ards
- Survey
- Free, with a written quote
How much does a double-storey extension cost in Newtownards?
Here is how the guide price for a double-storey extension breaks down in Newtownards. We start from national figures and adjust for Northern Ireland, which comes out about 14% below the national guide. The resulting range, VAT included, is £52,000–£103,000, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Newtownards |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £34,500–£56,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £52,000–£103,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £86,000–£155,000 |
The main things that change the figure:
- Combined floor area across both storeys
- How the new roof joins the existing roof
- Bathrooms, en-suites and plumbing on the upper floor
- Foundation depth, ground conditions and drains to divert
Scope of the work
- Groundworks, foundations and below-ground drainage
- Insulated cavity walls with brick or render to match the house
- Roof structure tied into the existing roof, tiled to match
- Scaffolding for the full build, erected and inspected
- Electrics, plumbing and heating by qualified trades, with certificates
- Windows, external doors, plastering and internal doors
What are homes like around Newtownards?
County Down takes in suburbs of Belfast, Bangor and Holywood with Victorian and Edwardian villas, and Newry, Downpatrick and Banbridge with older town centres and newer estates. Mourne granite appears in buildings around the mountains, and detached rural homes and bungalows are common across the county, often rendered or pebbledashed.
Villas and semis suit kitchen extensions, loft conversions and garden landscaping. Rural detached homes commonly take extensions and driveways, and rendered houses often need re-rendering, roofline renewal and window replacement.
Knowing the typical building types in County Down helps, but a survey of your own home in Newtownards is what decides the right approach to a double-storey extension.
Planning and building rules in Newtownards
For anyone in Newtownards, the relevant framework is Northern Ireland's. The summary below is general, so we always contact the council about your address before putting a price in writing.
In Northern Ireland, two-storey extensions usually need planning permission from the council.
Building control approval is needed under the Building Regulations (Northern Ireland). There is no Party Wall Act in Northern Ireland.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
A visit to your home
Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.
Written quote
We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.
Getting ready
We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.
On site to finish
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
What you can expect from us
Double-storey extensions in Newtownards: questions
How much will a double-storey extension cost in Newtownards?
As a guide, expect to pay £52,000–£103,000 including VAT for a double-storey extension in Newtownards. That range is adjusted for Northern Ireland, which runs about 14% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.
Is a double-storey extension better value than single-storey?
A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.
How long will a double-storey extension take?
On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.
Can we live at home while it is built?
Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.
Nearby towns
Our coverage in Newtownards includes BT23. We also travel to Bangor, County Down, Castlereagh and Belfast, so neighbouring addresses are looked after on exactly the same terms as those in town.

