South Yorkshire · Extensions & Renovations

Double-storey extensions in Dinnington

Double-storey extensions for homes in Dinnington and nearby Worksop, Rotherham and Rawmarsh, from survey to handover.

Two-storey side extension on a brick semi-detached house

Free survey in Dinnington

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

Every house in Dinnington is a little different, so we never price a double-storey extension from a brochure. We look at the structure, access and existing finishes first, then put in writing a fixed figure for the scope we settle on. As a rough steer, homeowners in Yorkshire and the Humber should budget £56,000–£113,000 including VAT, with work typically taking 14–22 weeks on site.

Guide price
£56,000–£113,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
S25
Planning rules
England
Local area
Rotherham
Survey
Free, with a written quote

What should you budget for a double-storey extension in Dinnington?

What should you budget for a double-storey extension in Dinnington? Use the figures below as a starting point. Prices in Yorkshire and the Humber sit about 6% below the national guide, so the range here is £56,000–£113,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.

Type of jobWhat it usually involvesGuide in Dinnington
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£37,500–£61,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£56,000–£113,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£94,000–£169,000

Your price depends mostly on:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert

What’s included?

  • Groundworks, foundations and below-ground drainage
  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Homes in South Yorkshire

Sheffield's housing climbs steep hillsides, with Victorian brick terraces, stone villas in the western suburbs and large interwar and post-war council estates. Barnsley, Rotherham and Doncaster have long rows of colliery-era brick terraces, post-war housing including some non-traditional construction, and newer estates continue to grow around Doncaster.

The Pennine edge brings heavy rain and cold winds, river valleys such as the Don have a history of flooding, and old mine workings can affect ground.

That mix of housing shapes how we approach a double-storey extension in Dinnington: the age and construction of your home affect the materials, the method and, in the end, the price.

Do you need permission in Dinnington?

The notes below cover England, which is where Dinnington sits. Rules change and every property is different, so we speak to the council before pricing your job.

In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.

Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Survey and measure

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a double-storey extension.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Getting ready

    With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Dinnington property.

  4. On site to finish

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

What you can expect from us

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Common questions

Which postcodes in Dinnington do you cover?

We cover S25, along with the rest of South Yorkshire. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.

Do you cover Worksop, Rotherham and Rawmarsh?

Yes. As well as Dinnington, we cover Worksop, Rotherham and Rawmarsh and the rest of South Yorkshire. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.

Do I need planning permission for a two-storey extension?

Most two-storey extensions need planning permission, but it depends on the size, height and position, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. In England, a two-storey rear extension can sometimes be built under permitted development if it is no deeper than 3m and at least 7m from the rear boundary. We check what applies before quoting.

How much does a double-storey extension cost?

A typical double-storey extension of 30–40m² across both floors costs £56,000–£113,000, built to a plastered finish. As a rough guide, allow around £1,400–£2,600 per square metre plus fixed costs for groundworks, scaffolding and fees. The second storey usually costs less per square metre than the first, because foundations and roof are shared. Bathrooms upstairs and a complex roof add most. We confirm a fixed price after the survey.

Is a double-storey extension better value than single-storey?

A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.

Near Dinnington

Coverage for Dinnington spans S25. Close by, Worksop, Rotherham and Rawmarsh are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Talk to us about a double-storey extension

Request your free survey for a double-storey extension in Dinnington. Once we've seen the property, we'll send a written price, fixed for the work as specified, with no obligation.

Call freeFree quote