A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.
For a homeowner in Rawmarsh, planning a double-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £56,000–£113,000 including VAT, and a typical job runs to 14–22 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.
- Guide price
- £56,000–£113,000 inc VAT
- Time on site
- 14–22 weeks on site
- Postcodes
- S62
- Planning rules
- England
- Local area
- Rotherham
- Survey
- Free, with a written quote
How much does a double-storey extension cost in Rawmarsh?
Here is how the guide price for a double-storey extension breaks down in Rawmarsh. We start from national figures and adjust for Yorkshire and the Humber, which comes out about 6% below the national guide. The resulting range, VAT included, is £56,000–£113,000, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Rawmarsh |
|---|---|---|
| Small (15–20m² total) | A compact rear or side extension adding a small room on each floor. | £37,500–£61,000 |
| Typical (30–40m² total) | A larger kitchen or living room below with a double bedroom or en-suite above. | £56,000–£113,000 |
| Large (50m² plus total) | Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing. | £94,000–£169,000 |
Expect these to shape the final quote:
- Combined floor area across both storeys
- How the new roof joins the existing roof
- Foundation depth, ground conditions and drains to divert
- Scaffolding duration, access and the level of finishes
What does the job include in Rawmarsh?
- Groundworks, foundations and below-ground drainage
- Insulated cavity walls with brick or render to match the house
- First-floor joists, stud walls and new openings upstairs
- Roof structure tied into the existing roof, tiled to match
- Windows, external doors, plastering and internal doors
- Building control inspections and completion certificate
Homes in South Yorkshire
Sheffield's housing climbs steep hillsides, with Victorian brick terraces, stone villas in the western suburbs and large interwar and post-war council estates. Barnsley, Rotherham and Doncaster have long rows of colliery-era brick terraces, post-war housing including some non-traditional construction, and newer estates continue to grow around Doncaster.
Terraces often suit loft conversions and rear extensions, and steep plots can call for retaining walls, steps and terraced patios. Older homes commonly need repointing, window replacement and roof work.
With that background in mind, here is how we typically handle a double-storey extension for homes in Rawmarsh, from the first visit to the finished result.
Do you need permission in Rawmarsh?
Which rules apply depends on where you live. For Rawmarsh, the answer is England, and the points below reflect that; we verify them with the council before quoting.
In England, a two-storey rear extension can only be permitted development if it is no more than 3 m deep, at least 7 m from the rear boundary and finished to match the house. Most double-storey and all two-storey side extensions need full planning permission.
Building Regulations approval is needed, with structural calculations for beams, foundations and the roof. The Party Wall etc. Act 1996 often applies on semi-detached and terraced houses.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
Survey and measure
A free survey comes first. It gives us what we need to price a double-storey extension properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.
Written quote
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Plan and prepare
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Rawmarsh property.
Finish and handover
During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.
Why homeowners choose us
Questions about a double-storey extension in Rawmarsh
Can you combine a double-storey extension with other work?
Yes. Because we manage several trades under one contract, we can plan a double-storey extension alongside other work on your Rawmarsh home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.
Can we live at home while it is built?
Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.
How long does a double-storey extension take?
A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.
How is the new roof joined to the existing house?
The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.