Double-storey extensions in Grangemouth

Typical time on site: 14–22 weeks on site. Guide price in Grangemouth: £58,000–£115,000 including VAT.

Two-storey side extension on a brick semi-detached house

Free survey in Grangemouth

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

In Grangemouth, as anywhere in Stirling, Falkirk and Clackmannanshire, the price of a double-storey extension is driven mainly by size, materials and access. Across Scotland our guide sits at £58,000–£115,000 with VAT, but restricted parking, a narrow side passage or extra preparation can move the figure either way. That is why every price we give follows a visit to the house.

Guide price
£58,000–£115,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
FK3
Planning rules
Scotland
Local area
Falkirk
Survey
Free, with a written quote

How much does a double-storey extension cost in Grangemouth?

The costs listed here are typical for a double-storey extension around Grangemouth and include VAT. They reflect labour and material costs in Scotland, about 4% below the national guide, giving a range of £58,000–£115,000. Exact pricing depends on your home, so we only fix it once a free site survey is done.

Type of jobWhat it usually involvesGuide in Grangemouth
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£38,500–£62,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£58,000–£115,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£96,000–£173,000

What moves the price up or down:

  • Combined floor area across both storeys
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert
  • Scaffolding duration, access and the level of finishes

Scope of the work

  • Groundworks, foundations and below-ground drainage
  • First-floor joists, stud walls and new openings upstairs
  • Roof structure tied into the existing roof, tiled to match
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.
Gable roofA simpler pitched roof with a triangular end wall, usually quicker to build.

Homes in Stirling, Falkirk and Clackmannanshire

Stirling's old town has historic stone buildings, with Victorian villas in the King's Park area and newer estates around the city. Falkirk and Grangemouth have industrial-era terraces and post-war housing, and Alloa and the Hillfoots villages in Clackmannanshire mix stone cottages, mill-era housing and harled council homes.

Stone homes commonly need repointing and slate roof repairs, and harled houses need re-rendering. Semis and bungalows suit extensions and loft conversions, and newer homes take garage conversions and driveways.

These patterns matter for a double-storey extension: older walls, roofs and floors in Grangemouth can need different materials or extra preparation compared with newer homes.

Permissions for a double-storey extension in Grangemouth

Because Grangemouth falls under Scotland's rules, the guidance below is the version relevant to you. Before sending a price, we check your property's position with the council.

In Scotland, extensions of more than one storey are only permitted development in narrow cases (Class 1B, well away from the boundary they face and outside conservation areas), so most need planning permission.

A building warrant is required before work starts. Scotland has no Party Wall Act; neighbour and title issues are handled under general law.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    First, someone visits your home in Grangemouth to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.

  3. Booking the work

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Build and hand over

    Our trades complete a double-storey extension while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

Why homeowners choose us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

How is the new roof joined to the existing house?

The new roof is usually tied into the existing roof so the two read as one. On a rear extension this often means a lower ridge or a hipped end, with valleys where the slopes meet. We strip back some existing tiles, fix new rafters and battens, and lay matching tiles or slates. Lead or proprietary flashings seal the junctions so water runs off properly.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

Can we live at home while it is built?

Most families stay at home during a double-storey extension. The new structure is built outside first, and we only break through into the existing rooms near the end, usually one floor at a time. Upstairs, this may mean a bedroom is out of use for a week or two. We fit dust screens, protect floors and stairs, and plan any time without water or power in advance.

Near Grangemouth

Coverage for Grangemouth spans FK3. Close by, Falkirk, Alloa and Bathgate are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Planning a double-storey extension in Grangemouth?

Planning a double-storey extension in Grangemouth? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.