Gwynedd · Landscaping & Outdoor Spaces

Fencing and gates in Caernarfon

Typical time on site: 1–3 days for a typical garden. Guide price in Caernarfon: £1,100–£2,800 including VAT.

New close-board timber fence with concrete posts and a side gate

Free survey in Caernarfon

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Fencing installation is setting fence posts into the ground, usually in concrete, and fixing panels or boards between them to mark a boundary, add privacy or keep children and pets in, with gates fitted where access is needed.

Addresses across LL55 fall within our coverage for new fencing and gates, so if your home is in Caernarfon we can arrange a survey on a day that works for you. We inspect the existing building, discuss materials and layout, and then price the agreed specification in writing. Expect a guide range of £1,100–£2,800 including VAT before that visit.

Guide price
£1,100–£2,800 inc VAT
Time on site
1–3 days for a typical garden
Postcodes
LL55
Planning rules
Wales
Local area
Gwynedd
Survey
Free, with a written quote

Fencing and gates prices in Caernarfon

Here is how the guide price for new fencing and gates breaks down in Caernarfon. We start from national figures and adjust for Wales, which comes out about 8% below the national guide. The resulting range, VAT included, is £1,100–£2,800, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Caernarfon
Repairs or a short runReplacing a few panels and posts, or a short run of up to about 6m.£300–£850
Typical garden boundaryAbout 20m of panel or closeboard fencing with concrete posts and gravel boards.£1,100–£2,800
Composite or long runs with gatesComposite or premium fencing, longer runs, or a driveway gate.£2,800–£6,400

Expect these to shape the final quote:

  • Fence style and material: panels, closeboard or composite
  • Post type: concrete, timber or aluminium
  • Ground conditions, slopes and removal of the old fence
  • Number, size and type of gates

Scope of the work

  • Measured survey of each fence run, levels and slopes
  • Removal and disposal of the old fence and posts
  • Concrete or timber posts set in concrete
  • Concrete or timber gravel boards to keep panels off the soil
  • Panels or boards fixed level or stepped to follow the ground
  • Gates hung with hinges, latches and locks
Lap or overlap panelsLower-cost panels for marking boundaries, quick to install.
Closeboard or featheredgeVertical boards on rails, strong and solid for privacy and exposed sites.
Slatted or hit-and-missHorizontal or alternating boards for a modern look that lets air through.
Side and driveway gatesTimber, metal or composite gates with secure latches and locks.

Homes in Gwynedd

Slate defines much of Gwynedd, from quarrying villages such as Bethesda and Blaenau Ffestiniog with their stone terraces to slate roofs across the county. Bangor and Caernarfon have Victorian and Georgian streets, Anglesey has stone cottages and bungalows, and resorts such as Pwllheli and Barmouth have Victorian terraces and newer bungalows.

Eryri (Snowdonia) is among the wettest areas in the UK, and exposed coasts take strong wind and salt, so render and roof details need to be robust.

These patterns matter for new fencing and gates: older walls, roofs and floors in Caernarfon can need different materials or extra preparation compared with newer homes.

Planning and building rules in Caernarfon

For anyone in Caernarfon, the relevant framework is Wales's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In Wales, fences, walls and gates up to 2 m high (1 m next to a road) are usually permitted development.

Building Regulations do not apply to ordinary fences.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. We look at the job

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Plan and prepare

    Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.

  4. On site to finish

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

Why homeowners choose us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Common questions

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Are concrete posts better than timber?

Concrete posts do not rot and are the most durable choice for panel fences, especially on exposed sites. They are heavier and more utilitarian in appearance. Timber posts look more natural and suit closeboard and featheredge fences, but they eventually rot at ground level, even when treated. Aluminium posts suit composite systems. We recommend posts based on your fence style and exposure.

Do I need planning permission in Caernarfon?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Caernarfon is in Wales, so Wales's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

How do you fence a sloping garden?

On a sloping garden, fence panels are usually stepped, so each panel is level and set slightly higher or lower than the one before, with the gap below filled by a gravel board. Closeboard fences can instead follow the slope, giving a smooth top line. The choice depends on how steep the slope is and the look you want. We discuss both at the survey.

How do I make my fence last longer?

A fence lasts longer when timber is kept off the soil and protected from moisture. Gravel boards beneath the panels, concrete posts and keeping plants and soil away from the fence all help. Treat timber with a preservative or stain every few years, and replace damaged boards promptly. Composite fencing needs only occasional washing.

Also covering areas around Caernarfon

Addresses in LL55 are all covered for Caernarfon, along with Bangor, Gwynedd, Holyhead and Llandudno close by. Give us your postcode when you get in touch and we will confirm the details.

Ready for a written price?

Get a clearer idea of the cost of new fencing and gates in Caernarfon with our guide-price tool, then book a survey at no charge when you're ready for a fixed figure.

Call freeFree quote