A replacement front or back door is a new door and frame, usually composite, uPVC or aluminium, made to fit your existing opening and fitted with multi-point locks and weather seals to improve security, warmth and kerb appeal.
Homeowners in Lossiemouth usually consider a new front or back door for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take Usually half a day to one day per door, and we work across Moray, including Elgin, Buckie and Forres.
- Guide price
- £950–£3,400 inc VAT
- Time on site
- Usually half a day to one day per door
- Postcodes
- IV31
- Planning rules
- Scotland
- Local area
- Moray
- Survey
- Free, with a written quote
What should you budget for a new front or back door in Lossiemouth?
These are guide costs, not quotes. For a new front or back door in Lossiemouth the range is £950–£3,400, VAT included, reflecting prices in Scotland that are about 4% below the national guide. Once we have visited for a free survey, you get a firm figure for the scope you approve.
| Type of job | What it usually involves | Guide in Lossiemouth |
|---|---|---|
| uPVC back door | A standard uPVC back or side door with a half-glazed panel and multi-point lock. | £750–£1,450 |
| Composite front door | A made-to-measure composite door in your chosen colour, glass design and hardware. | £1,150–£2,400 |
| Aluminium or door with side panels | A premium aluminium door, or a composite door with one or two side panels. | £2,400–£4,800 |
Expect these to shape the final quote:
- Door material: uPVC, composite or aluminium
- Side panels, fanlights and the amount of glass
- Colour, including different colours inside and out
- Condition of the opening, threshold and surrounding brickwork
What does the job include in Lossiemouth?
- Made-to-measure door and frame in your chosen colour and design
- Multi-point locking with anti-snap cylinders and matching handles
- Glazing panels, side panels or fanlights where specified
- Removal and disposal of the old door and frame
- Low threshold options for level or easier access
- Weather seals, sealant and internal trims finished neatly
Homes in Moray
Elgin and Forres have historic sandstone centres, fishing towns such as Buckie and Lossiemouth have stone cottages and terraces, and Speyside villages have grown around their distilleries. Harled cottages, farmhouses and modern estates on the edges of the main towns make up much of the remaining housing.
Moray is sunnier and drier than much of Scotland, but winters are cold and the Moray Firth coast is exposed.
None of this holds for every street in Lossiemouth, which is why we look at your actual house before pricing a new front or back door rather than assuming from its age alone.
Planning and building rules in Lossiemouth
For anyone in Lossiemouth, the relevant framework is Scotland's. The summary below is general, so we always contact the council about your address before putting a price in writing.
In Scotland, replacing windows and doors on a house generally needs no planning permission when the style is similar, but listed buildings and conservation areas are closely controlled and often need consent for any change of material or pattern.
A building warrant is not usually needed for like-for-like replacement windows, but the new units must still meet the Scottish building standards, including energy performance and, where relevant, escape from upper floors.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
A free survey comes first. It gives us what we need to price a new front or back door properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.
Quote in writing
We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.
Getting ready
We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.
Build and hand over
The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.
Why homeowners choose us
Frequently asked questions
How long will a new front or back door take?
On a typical home, allow Usually half a day to one day per door. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
How long will my home be open while the door is fitted?
Fitting a new door usually takes half a day to a full day, and your home is only open for the short time between taking out the old frame and fixing the new one. We keep the opening covered if there is any delay, and we never leave a doorway insecure overnight. Once the frame is fixed, we hang the door, adjust the locks, seal around the frame and finish the trims.
How long does it take to make a new door?
Made-to-measure doors usually take a few weeks to manufacture after the survey and your order are confirmed. Bespoke colours, special glass designs and aluminium doors can take longer. Once the door arrives, we arrange a fitting date that suits you. We give you a realistic lead time with your written quote, and we keep you updated if the manufacturer's dates change.
Do I need permission to change my front door?
Planning permission is not usually needed to replace a front door, but it depends on the style and size of the change, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. Listed homes generally need consent for any change, and some conservation areas control colours and styles. Flat entrance doors in shared buildings must also meet fire rules. We check before quoting.
Do I need planning permission in Lossiemouth?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Lossiemouth is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
Near Lossiemouth
Our coverage in Lossiemouth includes IV31. We also travel to Elgin, Buckie and Forres, so neighbouring addresses are looked after on exactly the same terms as those in town.

