A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
Homeowners in Dunstable usually consider a whole-house renovation for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take 8–24 weeks on site, depending on scope, and we work across Bedfordshire, including Luton, Leighton Buzzard and Harpenden.
- Guide price
- £47,000–£126,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- LU6
- Planning rules
- England
- Local area
- Central Bedfordshire
- Survey
- Free, with a written quote
What should you budget for a whole-house renovation in Dunstable?
What should you budget for a whole-house renovation in Dunstable? Use the figures below as a starting point. Prices in the East of England sit about 5% above the national guide, so the range here is £47,000–£126,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.
| Type of job | What it usually involves | Guide in Dunstable |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £16,000–£47,000 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £47,000–£126,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £105,000–£189,000 |
What moves the price up or down:
- Size of the house and number of rooms being renovated
- Kitchen and bathroom specification
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
What does the job include in Dunstable?
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Heating and plumbing upgrades by qualified engineers
- New kitchen and bathroom fitted to your chosen specification
- Decoration and a final clean before handover
Building in Dunstable
Bedfordshire has a long brick-making history, and brick dominates: Victorian terraces in Bedford and Luton, interwar semis, large post-war estates around Luton and Dunstable, and newer developments near Bedford and Biggleswade. Villages in the north of the county keep limestone cottages, with timber framing and thatch scattered across older settlements.
Bedfordshire is relatively dry, and its clay soils can shrink in long, dry summers, so foundation depth and nearby trees matter for extensions.
None of this holds for every street in Dunstable, which is why we look at your actual house before pricing a whole-house renovation rather than assuming from its age alone.
Planning and building rules in Dunstable
The notes below cover England, which is where Dunstable sits. Rules change and every property is different, so we speak to the council before pricing your job.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
Free site survey
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.
Written quote
You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a whole-house renovation.
Booking the work
Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.
Finish and handover
The work is carried out to the agreed specification, with floors and furniture protected and the site kept tidy. At the end we clean up, walk through the finished job with you and hand over any certificates.
Why homeowners choose us
Whole-house renovations in Dunstable: questions
Do you cover Luton, Leighton Buzzard and Harpenden?
Yes. As well as Dunstable, we cover Luton, Leighton Buzzard and Harpenden and the rest of Bedfordshire. Our coverage is UK-wide, so the process is the same wherever you are: a free site survey, a quote in writing that fixes the price for the agreed scope, and one point of contact while the work is planned and carried out.
Which parts of a renovation need building regulations approval?
Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.
How much will a whole-house renovation cost in Dunstable?
As a guide, expect to pay £47,000–£126,000 including VAT for a whole-house renovation in Dunstable. That range is adjusted for the East of England, which runs about 5% above the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.
What contingency should I allow?
A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
Nearby towns
Dunstable and its LU6 postcodes are part of our coverage. Homeowners in Luton, Leighton Buzzard and Harpenden can also book a free survey with us and receive a written price for their job.

