A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.
We take on a whole-house renovation throughout Limavady and the surrounding BT49 postcodes, as well as in Coleraine, Derry/Londonderry and Magherafelt. The guide range for this work in Northern Ireland is £38,500–£103,000 including VAT; where your project falls depends on its size, the materials you pick and how easy the site is to reach. A free survey turns that range into a fixed figure.
- Guide price
- £38,500–£103,000 inc VAT
- Time on site
- 8–24 weeks on site, depending on scope
- Postcodes
- BT49
- Planning rules
- Northern Ireland
- Local area
- County Londonderry
- Survey
- Free, with a written quote
How much does a whole-house renovation cost in Limavady?
Budgeting for a whole-house renovation in Limavady? The numbers below include VAT and are adjusted for Northern Ireland, where costs are about 14% below the national guide. The headline range is £38,500–£103,000. Nothing is final until we have measured up at a free survey and agreed the specification with you.
| Type of job | What it usually involves | Guide in Limavady |
|---|---|---|
| Light refurbishment | Decoration, flooring, minor repairs and perhaps one new kitchen or bathroom. | £13,000–£38,500 |
| Full refurbishment | Rewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house. | £38,500–£103,000 |
| Renovation with structural changes | A full refurbishment plus wall removal, layout changes or extra bathrooms. | £86,000–£155,000 |
The main things that change the figure:
- Size of the house and number of rooms being renovated
- Kitchen and bathroom specification
- Structural or layout changes and associated approvals
- Hidden problems such as damp, rot or outdated drainage
What does the job include in Limavady?
- Room-by-room survey and a planned order of works
- Strip-out of old kitchens, bathrooms, flooring and finishes
- Rewiring and new consumer unit by qualified electricians, with certificates
- Heating and plumbing upgrades by qualified engineers
- Flooring, internal doors, skirting and joinery
- Decoration and a final clean before handover
Local housing and a whole-house renovation
Derry has Georgian and Victorian terraces around its walled city, alongside large post-war estates and newer developments. Coleraine, Limavady and Magherafelt mix older town centres with semis and estates, Portstewart has seaside villas, and rural areas have many detached homes and bungalows, often roughcast.
Terraces suit loft conversions and rear extensions, while rural bungalows commonly take extensions, loft rooms and driveways. Roughcast homes often need re-rendering, and coastal houses need roofline and window renewal.
That mix of housing shapes how we approach a whole-house renovation in Limavady: the age and construction of your home affect the materials, the method and, in the end, the price.
Permissions for a whole-house renovation in Limavady
As Limavady is in Northern Ireland, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.
Internal improvements do not need planning permission in Northern Ireland unless the building is listed.
The Building Regulations (Northern Ireland) apply to structural work, drainage and ventilation; electrical work should be tested and certified.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
A visit to your home
It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a whole-house renovation.
Written quote
We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.
Getting ready
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.
The work itself
During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.
Why homeowners choose us
Common questions
In what order should renovation work be done?
A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.
Who do I deal with during the job?
One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.
What happens if you find damp or rot?
If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.
How long will a whole-house renovation take?
On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
What contingency should I allow?
A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.