Gloucestershire · Extensions & Renovations

Whole-house renovations in Cheltenham

Guide price £46,000–£122,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Cheltenham

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

We take on a whole-house renovation throughout Cheltenham and the surrounding GL50, GL51 and GL53 postcodes, as well as in Tewkesbury, Gloucester and Stroud. The guide range for this work in the South West is £46,000–£122,000 including VAT; where your project falls depends on its size, the materials you pick and how easy the site is to reach. A free survey turns that range into a fixed figure.

Guide price
£46,000–£122,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
GL50, GL51 and GL53
Planning rules
England
Local area
Gloucestershire
Survey
Free, with a written quote

What should you budget for a whole-house renovation in Cheltenham?

Here is how the guide price for a whole-house renovation breaks down in Cheltenham. We start from national figures and adjust for the South West, which comes out about 2% above the national guide. The resulting range, VAT included, is £46,000–£122,000, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Cheltenham
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£15,500–£46,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£46,000–£122,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£102,000–£184,000

Your price depends mostly on:

  • Size of the house and number of rooms being renovated
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals
  • Hidden problems such as damp, rot or outdated drainage

What does the job include in Cheltenham?

  • Room-by-room survey and a planned order of works
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • Flooring, internal doors, skirting and joinery
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Homes in Gloucestershire

Golden Cotswold limestone defines towns and villages such as Cirencester, Stow and Tetbury, often with stone-slate roofs. Cheltenham is known for Regency stucco terraces and villas, Gloucester has Victorian brick terraces and interwar estates, the Stroud valleys have mill-era stone cottages, and the Forest of Dean uses its own sandstone.

The Cotswold escarpment is exposed to wind and rain, while low ground along the Severn has a well-known flood risk.

Knowing the typical building types in Gloucestershire helps, but a survey of your own home in Cheltenham is what decides the right approach to a whole-house renovation.

Planning and building rules in Cheltenham

Each UK nation sets its own consent rules, and Cheltenham is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    It starts with a survey at the property, free of charge. We check condition, access and services, ask how you want the finished result to look, and answer any questions you have about a whole-house renovation.

  2. Written quote

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Getting ready

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. The work itself

    On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.

How we work

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Common questions

What contingency should I allow?

A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

How long does a full house renovation take?

A full renovation of a typical 3-bed house usually takes around 8–16 weeks on site, and longer if there are structural changes or extensive repairs. A light refresh may take only a few weeks. Material lead times for kitchens, windows and bathroom fittings also affect the programme. We give you a week-by-week plan with your quote and update it as the work progresses.

Nearby towns

Live in Cheltenham? Our coverage takes in the GL50, GL51 and GL53 postcode areas and reaches out to Tewkesbury, Gloucester and Stroud, so homes on the outskirts and in the next town along are included.

Ready for a written price?

Get a written quote for a whole-house renovation at your Cheltenham home. The survey costs nothing, and there's no obligation to go ahead once you have seen our figure.

Call freeFree quote