Hampshire · Extensions & Renovations

Whole-house renovations in Havant

Guide price £50,000–£134,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Havant

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Thinking about a whole-house renovation in Havant? We take charge of the whole project, co-ordinating every trade involved, and one person keeps you updated. Guide prices for the South East sit at £50,000–£134,000 including VAT, and a typical job takes 8–24 weeks on site, depending on scope. Your own figure depends on what the survey finds and the specification you settle on.

Guide price
£50,000–£134,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
PO9
Planning rules
England
Local area
Hampshire
Survey
Free, with a written quote

How much does a whole-house renovation cost in Havant?

These are guide costs, not quotes. For a whole-house renovation in Havant the range is £50,000–£134,000, VAT included, reflecting prices in the South East that are about 12% above the national guide. Once we have visited for a free survey, you get a firm figure for the scope you approve.

Type of jobWhat it usually involvesGuide in Havant
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£17,000–£50,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£50,000–£134,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£112,000–£202,000

Expect these to shape the final quote:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Hidden problems such as damp, rot or outdated drainage

What does the job include in Havant?

  • Room-by-room survey and a planned order of works
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Building in Havant

Southampton and Portsmouth have dense Victorian terraces, with plenty of post-war rebuilding after wartime bombing. Winchester keeps Georgian and medieval streets, Basingstoke expanded rapidly with 1960s and 1970s estates, and New Forest villages feature cob, thatch and brick. Brick and flint is common on the chalk downs, and new estates ring most towns.

Terraces suit loft rooms and side-return extensions; post-war and expanded-town homes often need window, roofline and cladding renewal. Cottages in the Forest may call for lime repairs and planning-sensitive windows.

That variety is why a guide price for a whole-house renovation in Havant is only a starting point; the survey shows what your particular property needs.

Planning and building rules in Havant

Homes in Havant come under the regulations for England, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Quote in writing

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a whole-house renovation.

  3. Plan and prepare

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.

  4. The work itself

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

Working with SK Home Improvements

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Frequently asked questions

Do I need planning permission to renovate?

Most internal renovation work does not need planning permission, but it depends on what changes, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. Listed buildings usually need consent for internal and external changes. Altering windows, adding dormers or changing the outside appearance in a conservation area may also need permission. We check before quoting.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £50,000–£134,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

Can you combine a whole-house renovation with other work?

Yes. Because we manage several trades under one contract, we can plan a whole-house renovation alongside other work on your Havant home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Nearby towns

Homes across PO9 in Havant are within our coverage, as are those in Emsworth, Waterlooville and Portsmouth. If you are just outside these areas, ask anyway, because we work right across the UK.

Talk to us about a whole-house renovation

For a fixed price on a whole-house renovation in Havant, the first step is a free survey. Contact us and we'll arrange a convenient visit.

Call freeFree quote