London · Extensions & Renovations

Whole-house renovations in Canary Wharf

Guide price £58,000–£156,000 including VAT, typically 8–24 weeks on site, depending on scope, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Canary Wharf

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

We take on a whole-house renovation throughout Canary Wharf and the surrounding E1, E3, E14 and E1W postcodes, as well as in Blackwall, Bow and Canning Town. The guide range for this work in London is £58,000–£156,000 including VAT; where your project falls depends on its size, the materials you pick and how easy the site is to reach. A free survey turns that range into a fixed figure.

Guide price
£58,000–£156,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
E1, E3, E14, E1W and SE8
Planning rules
England
Local area
Greater London
Survey
Free, with a written quote

Whole-house renovations prices in Canary Wharf

Use the table to gauge the cost of a whole-house renovation in Canary Wharf before we visit. Figures include VAT and are scaled for London, coming out about 30% above the national guide, which gives £58,000–£156,000 overall. After a free survey, you receive a fixed written price.

Type of jobWhat it usually involvesGuide in Canary Wharf
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£19,500–£58,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£58,000–£156,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£130,000–£234,000

Your price depends mostly on:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals

What does the job include in Canary Wharf?

  • Room-by-room survey and a planned order of works
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.

Homes in London

London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.

Terraces suit side-return extensions and rear dormer loft conversions; interwar semis commonly take hip-to-gable lofts. Shared party walls, restricted parking and conservation rules often shape the plans and the programme.

These patterns matter for a whole-house renovation: older walls, roofs and floors in Canary Wharf can need different materials or extra preparation compared with newer homes.

Do you need permission in Canary Wharf?

As Canary Wharf is in England, read the following with that system of planning and building control in mind. We check what applies to your house with the council before you receive a quote.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Quote in writing

    Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.

  3. Getting ready

    Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.

  4. Build and hand over

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

What you can expect from us

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Frequently asked questions

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

What happens if you find damp or rot?

If we find damp or rot during a renovation, we stop that area, show you the problem and explain the likely cause, such as a leaking gutter, bridged damp-proof course or poor ventilation. We then give you a written price to fix the cause and repair the damage before carrying on. Treating the cause matters more than treating the symptom, so we focus on that first.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a whole-house renovation, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Can we live in the house while it is renovated?

Living in a house during a full renovation is possible but hard, especially while rewiring, plastering and the kitchen and bathroom are being done. Many people move out for the noisiest weeks or stay elsewhere for the whole project. If you stay, we can phase the work room by room and keep one bathroom and a basic kitchen working for as long as possible. We discuss this at the survey.

Near Canary Wharf

Addresses in E1, E3, E14 and E1W are all covered for Canary Wharf, along with Blackwall, Bow and Canning Town close by. Give us your postcode when you get in touch and we will confirm the details.

Talk to us about a whole-house renovation

Arrange a visit to your home in Canary Wharf, at no charge. We'll measure up for a whole-house renovation, talk through the options and follow up with a fixed price in writing.

Call freeFree quote