England · Extensions & Renovations

Whole-house renovations in Norfolk

Typical time on site: 8–24 weeks on site, depending on scope. Guide price in Norfolk: £47,000–£126,000 including VAT.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Norfolk

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

If you are planning a whole-house renovation anywhere in Norfolk, including Norwich, Great Yarmouth, King's Lynn and Thetford, we can visit, measure up and talk through the options. The planning and building regulations we work to are those for England, and we check them for your address before quoting. Prices remain guide figures for the East of England, at £47,000–£126,000 including VAT, until the survey is done.

Guide price
£47,000–£126,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Planning rules
England
Price level
About 5% above the national guide
Towns listed
6
Survey
Free, with a written quote

Whole-house renovations prices in Norfolk

What will a whole-house renovation cost in Norfolk? Our guide range is £47,000–£126,000 including VAT. That figure is adjusted for the East of England, about 5% above the national guide, and is intended for planning a budget. A firm written price for your chosen specification follows a free survey at your home.

Type of jobWhat it usually involvesGuide in Norfolk
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£16,000–£47,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£47,000–£126,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£105,000–£189,000

What moves the price up or down:

  • Size of the house and number of rooms being renovated
  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • New kitchen and bathroom fitted to your chosen specification
  • Decoration and a final clean before handover
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.

Homes in Norfolk

Flint is everywhere in Norfolk, often combined with brick quoins and red or black-glazed pantile roofs. Norwich has Victorian terraces and interwar suburbs around its medieval centre, Norfolk reed thatch survives across the county, carrstone is used in the west, and coastal towns such as Great Yarmouth and Cromer have Victorian terraces and newer bungalows.

Flint walls often need lime repointing and careful repairs, and pantile roofs need matching tiles. Norwich terraces suit loft conversions and rear extensions, while coastal bungalows commonly take loft rooms, porches and new windows.

Norfolk is dry but exposed, with strong easterly winds, an eroding coast in places and low-lying land around the Broads.

Planning and building rules in Norfolk

For anyone in Norfolk, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. A visit to your home

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a whole-house renovation so the price reflects your home.

  2. Price and scope agreed

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Booking the work

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.

  4. On site to finish

    Our trades complete a whole-house renovation while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

What you can expect from us

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Frequently asked questions

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

Which parts of a renovation need building regulations approval?

Several parts of a renovation fall under building regulations, including rewiring and new circuits, new boilers and heating systems, structural changes such as removing walls, replacement windows and changes to drainage. Some of this is self-certified by suitably registered trades, and some needs building control approval. In Scotland a building warrant may be needed for certain works. We arrange the right approvals and certificates.

What contingency should I allow?

A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.

Can you combine a whole-house renovation with other work?

Yes. Because we manage several trades under one contract, we can plan a whole-house renovation alongside other work on your Norfolk home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Towns in Norfolk

Homes in all of the following Norfolk towns can get a written quote for a whole-house renovation. Open a town page to see prices and the postcodes we cover.

Ready for a written price?

Arrange a visit to your home in Norfolk, at no charge. We'll measure up for a whole-house renovation, talk through the options and follow up with a fixed price in writing.

Call freeFree quote