Oxfordshire · Extensions & Renovations

Whole-house renovations in Bicester

From the first visit to the final check, a whole-house renovation in Bicester is planned and managed for you.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in Bicester

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

For a homeowner in Bicester, planning a whole-house renovation tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £50,000–£134,000 including VAT, and a typical job runs to 8–24 weeks on site, depending on scope. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£50,000–£134,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Postcodes
OX6 and OX26
Planning rules
England
Local area
Oxfordshire
Survey
Free, with a written quote

Whole-house renovations prices in Bicester

Here is how the guide price for a whole-house renovation breaks down in Bicester. We start from national figures and adjust for the South East, which comes out about 12% above the national guide. The resulting range, VAT included, is £50,000–£134,000, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in Bicester
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£17,000–£50,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£50,000–£134,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£112,000–£202,000

The main things that change the figure:

  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals
  • Hidden problems such as damp, rot or outdated drainage

What does the job include in Bicester?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Plastering, skimming and repairs to ceilings and walls
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Energy upgradeInsulation, new windows and heating improvements to make the home warmer and cheaper to run.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Building in Bicester

West Oxfordshire's Cotswold villages are built of honey-coloured limestone, while Banbury and the north use orange ironstone. Oxford has Victorian terraces in Jericho and East Oxford and Gothic brick villas in North Oxford. Didcot, Bicester and Witney have grown with large new estates around older market-town centres.

Stone cottages often need lime pointing and conservation-sensitive windows. Victorian terraces suit loft conversions and side-return extensions, and newer estate homes commonly take garage conversions and garden landscaping.

In Bicester, as elsewhere in Oxfordshire, we take the building's age and construction into account before recommending anything, because both can change what is involved in a whole-house renovation.

Do you need permission in Bicester?

For anyone in Bicester, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Free site survey

    A free survey comes first. It gives us what we need to price a whole-house renovation properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.

  2. Your fixed price

    We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.

  3. Plan and prepare

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a whole-house renovation are in place before the first day on site.

  4. Build and hand over

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

Why homeowners choose us

Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Common questions

How long will a whole-house renovation take?

On a typical home, allow 8–24 weeks on site, depending on scope. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How much does it cost to renovate a whole house?

A full refurbishment of a typical 3-bed house costs £50,000–£134,000, covering rewiring, heating, plastering, a new kitchen and bathroom, flooring and decoration. A light refresh costs much less, while renovations with structural changes cost more. The biggest variables are the condition of the house and the kitchen and bathroom specification. We survey every room and give you a written price for the agreed scope.

What contingency should I allow?

A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

Also covering areas around Bicester

Whether you're in the centre of Bicester or on its outskirts, OX6 and OX26 addresses are covered. We extend the same service, and the same fixed-price approach, to Oxford, Banbury and Aylesbury.

Planning a whole-house renovation in Bicester?

Not sure of your budget yet? Try our guide-price tool for a whole-house renovation, then book a free survey in Bicester when you want a firm figure.

Call freeFree quote