A new kitchen installation replaces your old units, worktops and appliances with a new layout fitted to your room, including the plumbing, electrics, tiling and finishing needed to leave a complete, working kitchen.
Addresses across PE15 fall within our coverage for a new kitchen, so if your home is in March we can arrange a survey on a day that works for you. We inspect the existing building, discuss materials and layout, and then price the agreed specification in writing. Expect a guide range of £8,400–£23,000 including VAT before that visit.
- Guide price
- £8,400–£23,000 inc VAT
- Time on site
- 1–3 weeks on site
- Postcodes
- PE15
- Planning rules
- England
- Local area
- Cambridgeshire
- Survey
- Free, with a written quote
What should you budget for a new kitchen in March?
Below is a breakdown of typical costs for a new kitchen in March. Because rates in the East of England are about 5% above the national guide, the overall guide comes to £8,400–£23,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.
| Type of job | What it usually involves | Guide in March |
|---|---|---|
| Value kitchen | Standard units and laminate worktops in a small or medium room, keeping the existing layout. | £5,200–£9,400 |
| Mid-range kitchen | Better units, some layout changes, built-in appliances and a choice of worktops. | £9,400–£21,000 |
| Premium kitchen | High-end units, stone worktops, an island and premium appliances in a larger room. | £21,000–£42,000 |
What moves the price up or down:
- Length of units and the size of the room
- Moving the sink, hob or other services to a new position
- Appliances, including built-in and premium models
- Tiling, flooring and any wall removal or replastering
What does the job include in March?
- Measured survey and layout planning for your room
- Removal and disposal of the old kitchen
- Plumbing for sink, dishwasher and washing machine
- Electrics and new circuits by qualified electricians, with certificates
- Units, worktops and appliances fitted, levelled and adjusted
- Making good, extractor ducting and a final clean
What are homes like around March?
Cambridge has many Victorian terraces in pale gault brick, with Edwardian villas and modern estates around the city. Peterborough expanded as a new town from the 1970s, adding large planned estates, while Ely, Huntingdon, St Neots and the Fenland market towns keep Georgian and Victorian centres. Limestone appears in villages near the Northamptonshire border.
Narrow terraces commonly suit loft conversions and kitchen extensions. Newer estate homes often need garage conversions, porches and landscaping, and older brick and stone buildings may call for lime-based repointing and carefully specified windows.
Building traditions across Cambridgeshire also raise conservation and planning questions, so we check those for a new kitchen in March at the survey stage.
Planning and building rules in March
Which rules apply depends on where you live. For March, the answer is England, and the points below reflect that; we verify them with the council before quoting.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
From survey to handover
We look at the job
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a new kitchen so the price reflects your home.
Price and scope agreed
After the survey we send a quote for a new kitchen that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.
Plan and prepare
Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.
Build and hand over
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
What you can expect from us
Kitchens in March: questions
Which worktop material should I choose?
Laminate worktops are the most affordable and come in many stone and wood effects, though they can be damaged by hot pans. Solid wood is warm and repairable but needs regular oiling. Quartz is very hard-wearing, stain-resistant and needs little maintenance, but it costs more and is made to template after the units are fitted. We bring samples and explain the care each one needs.
Do I need a new extractor fan?
A kitchen needs effective extraction to remove steam, cooking smells and grease, and building regulations set minimum rates for new or altered kitchens. A ducted extractor that vents outside is the most effective, while recirculating hoods filter the air and return it to the room. We check whether a duct can reach an outside wall and recommend a hood that suits your hob and room size.
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new kitchen, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
How long will a new kitchen take?
On a typical home, allow 1–3 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
How much does a new kitchen cost?
A mid-range kitchen of around 5–7 linear metres of units costs £8,400–£23,000 supplied and fitted. Value kitchens in smaller rooms cost less, and premium kitchens with stone worktops, an island and high-end appliances cost more. Moving the sink or hob, new electrics and replastering also affect the total. As a guide, allow roughly £1,000–£2,800 per linear metre of units plus fixed fitting costs. We confirm a fixed price after the survey.
Near March
We survey and quote throughout March's PE15 postcodes and in surrounding places such as Wisbech, Ely and Peterborough. The process and pricing approach are identical in each of them.

