A new kitchen installation replaces your old units, worktops and appliances with a new layout fitted to your room, including the plumbing, electrics, tiling and finishing needed to leave a complete, working kitchen.
If you have a new kitchen on your list for a property in Grays, we can help from the first measurements to the final clean-up. For a typical home, plan for 1–3 weeks on site, though larger or more complex jobs take longer. We cover postcodes DA10, RM16, RM17 and RM18 and nearby South Ockendon, Gravesend and Dartford, and every quote we send is fixed for the scope described in it.
- Guide price
- £8,400–£23,000 inc VAT
- Time on site
- 1–3 weeks on site
- Postcodes
- DA10, RM16, RM17, RM18 and RM20
- Planning rules
- England
- Local area
- Thurrock
- Survey
- Free, with a written quote
What should you budget for a new kitchen in Grays?
Here is how the guide price for a new kitchen breaks down in Grays. We start from national figures and adjust for the East of England, which comes out about 5% above the national guide. The resulting range, VAT included, is £8,400–£23,000, and a survey, at no cost to you, firms it up.
| Type of job | What it usually involves | Guide in Grays |
|---|---|---|
| Value kitchen | Standard units and laminate worktops in a small or medium room, keeping the existing layout. | £5,200–£9,400 |
| Mid-range kitchen | Better units, some layout changes, built-in appliances and a choice of worktops. | £9,400–£21,000 |
| Premium kitchen | High-end units, stone worktops, an island and premium appliances in a larger room. | £21,000–£42,000 |
What moves the price up or down:
- Length of units and the size of the room
- Moving the sink, hob or other services to a new position
- Appliances, including built-in and premium models
- Tiling, flooring and any wall removal or replastering
What do you get?
- Measured survey and layout planning for your room
- Plumbing for sink, dishwasher and washing machine
- Electrics and new circuits by qualified electricians, with certificates
- Gas connections by a suitably registered engineer where needed
- Units, worktops and appliances fitted, levelled and adjusted
- Splashbacks or wall tiling to your chosen design
Homes in Essex
Essex ranges from timber-framed and weatherboarded cottages in the north, some with decorative pargeting, to Victorian terraces in Colchester, Chelmsford and Southend. Basildon and Harlow were built as post-war new towns, much of the south-east has interwar suburbs and bungalows, and large new estates continue to appear around Chelmsford and Braintree.
Essex is one of the driest counties in England, and London Clay in the south shrinks in dry spells, so trees and foundation depth matter.
In Grays, as elsewhere in Essex, we take the building's age and construction into account before recommending anything, because both can change what is involved in a new kitchen.
Planning and building rules in Grays
Planning law differs across the UK. For a home in Grays, it is the England rules below that count, and we check them with the council ahead of any quote.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
A visit to your home
Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.
Price and scope agreed
Next you receive a written quote with a fixed price for the agreed specification. It lists what is included, what is not, and how payments are staged, so you can compare it properly.
Getting ready
We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.
Finish and handover
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
Why homeowners choose us
Common questions
What happens at the survey?
We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new kitchen, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.
How long will a new kitchen take?
On a typical home, allow 1–3 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Do I need a new extractor fan?
A kitchen needs effective extraction to remove steam, cooking smells and grease, and building regulations set minimum rates for new or altered kitchens. A ducted extractor that vents outside is the most effective, while recirculating hoods filter the air and return it to the room. We check whether a duct can reach an outside wall and recommend a hood that suits your hob and room size.
Can I move my sink or cooker to a new position?
Moving the sink, hob or cooker is usually possible but adds cost, because waste pipes, water supplies, gas and electrics have to be rerouted. Sinks need waste pipes to fall towards the drain, so the position of the outside wall matters. Hobs may need a new circuit or gas run and a suitable extractor route. We check what is practical during the survey and price each change separately.
How long will I be without a kitchen?
You are usually without a working kitchen for one to two weeks, from strip-out until the sink and hob are reconnected. If stone worktops are being made to template, we can fit a temporary worktop so you can use the sink while you wait. Many people set up a microwave, kettle and fridge in another room. We plan the order of work to keep this period as short as possible.
Nearby towns
Whether you're in the centre of Grays or on its outskirts, DA10, RM16, RM17 and RM18 addresses are covered. We extend the same service, and the same fixed-price approach, to South Ockendon, Gravesend and Dartford.

