A new kitchen installation replaces your old units, worktops and appliances with a new layout fitted to your room, including the plumbing, electrics, tiling and finishing needed to leave a complete, working kitchen.
We take on a new kitchen throughout Canary Wharf and the surrounding E1, E3, E14 and E1W postcodes, as well as in Blackwall, Bow and Canning Town. The guide range for this work in London is £10,500–£28,500 including VAT; where your project falls depends on its size, the materials you pick and how easy the site is to reach. A free survey turns that range into a fixed figure.
- Guide price
- £10,500–£28,500 inc VAT
- Time on site
- 1–3 weeks on site
- Postcodes
- E1, E3, E14, E1W and SE8
- Planning rules
- England
- Local area
- Greater London
- Survey
- Free, with a written quote
Kitchens prices in Canary Wharf
In Canary Wharf, guide figures for a new kitchen sit at £10,500–£28,500, VAT included. We set them using rates for London, currently about 30% above the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.
| Type of job | What it usually involves | Guide in Canary Wharf |
|---|---|---|
| Value kitchen | Standard units and laminate worktops in a small or medium room, keeping the existing layout. | £6,500–£11,500 |
| Mid-range kitchen | Better units, some layout changes, built-in appliances and a choice of worktops. | £11,500–£26,000 |
| Premium kitchen | High-end units, stone worktops, an island and premium appliances in a larger room. | £26,000–£52,000 |
Expect these to shape the final quote:
- Length of units and the size of the room
- Unit range, door finish and worktop material
- Moving the sink, hob or other services to a new position
- Appliances, including built-in and premium models
What do you get?
- Removal and disposal of the old kitchen
- Plumbing for sink, dishwasher and washing machine
- Electrics and new circuits by qualified electricians, with certificates
- Gas connections by a suitably registered engineer where needed
- Splashbacks or wall tiling to your chosen design
- Making good, extractor ducting and a final clean
Homes in London
London's housing is dominated by Victorian and Edwardian terraces, often in yellow London stock brick, with Georgian terraces in central districts and mansion blocks across many inner areas. Outer boroughs have large belts of interwar semis, and there are extensive post-war council estates. Many houses have been split into flats, and conservation areas are widespread.
London Clay shrinks and swells with the seasons, and street trees close to houses can contribute to movement, which affects foundation design.
None of this holds for every street in Canary Wharf, which is why we look at your actual house before pricing a new kitchen rather than assuming from its age alone.
Do you need permission in Canary Wharf?
For anyone in Canary Wharf, the relevant framework is England's. The summary below is general, so we always contact the council about your address before putting a price in writing.
Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.
Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
What happens after you get in touch?
We look at the job
We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a new kitchen, and photograph or measure anything the quote needs to reflect.
Price and scope agreed
After the survey we send a quote for a new kitchen that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.
Booking the work
With the quote agreed, we book the work in and handle preparation: permissions where needed, building control notifications, material orders and access arrangements for your Canary Wharf property.
The work itself
Our trades complete a new kitchen while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.
What you can expect from us
Questions about a new kitchen in Canary Wharf
Can I move my sink or cooker to a new position?
Moving the sink, hob or cooker is usually possible but adds cost, because waste pipes, water supplies, gas and electrics have to be rerouted. Sinks need waste pipes to fall towards the drain, so the position of the outside wall matters. Hobs may need a new circuit or gas run and a suitable extractor route. We check what is practical during the survey and price each change separately.
How long will a new kitchen take?
On a typical home, allow 1–3 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Which postcodes in Canary Wharf do you cover?
We cover E1, E3, E14 and E1W, along with the rest of London. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.
Do I need a new extractor fan?
A kitchen needs effective extraction to remove steam, cooking smells and grease, and building regulations set minimum rates for new or altered kitchens. A ducted extractor that vents outside is the most effective, while recirculating hoods filter the air and return it to the room. We check whether a duct can reach an outside wall and recommend a hood that suits your hob and room size.
How long will I be without a kitchen?
You are usually without a working kitchen for one to two weeks, from strip-out until the sink and hob are reconnected. If stone worktops are being made to template, we can fit a temporary worktop so you can use the sink while you wait. Many people set up a microwave, kettle and fridge in another room. We plan the order of work to keep this period as short as possible.
Near Canary Wharf
Live in Canary Wharf? Our coverage takes in the E1, E3, E14 and E1W postcode areas and reaches out to Blackwall, Bow and Canning Town, so homes on the outskirts and in the next town along are included.

