Dyfed · Landscaping & Outdoor Spaces

Patios and paving in Llanelli

Local guide: £2,300–£5,100 inc VAT. Planning notes for Wales, a free survey and one point of contact.

Light grey porcelain patio outside French doors

Free survey in Llanelli

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A patio is a paved outdoor area next to the house or in the garden, laid in porcelain, natural stone or concrete slabs on a compacted sub-base and mortar bed, with falls that direct rainwater away from the house.

For a homeowner in Llanelli, planning a new patio tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £2,300–£5,100 including VAT, and a typical job runs to 3–7 days on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£2,300–£5,100 inc VAT
Time on site
3–7 days on site
Postcodes
SA15
Planning rules
Wales
Local area
Carmarthenshire
Survey
Free, with a written quote

Patios and paving prices in Llanelli

To help you plan, we show what a new patio typically costs in Llanelli instead of holding figures back for a sales call. The range is £2,300–£5,100 with VAT, using rates in Wales that are about 8% below the national guide. A free survey then fixes your actual price.

Type of jobWhat it usually involvesGuide in Llanelli
Small patio or pathAround 10m² of concrete slabs or a garden path.£900–£2,300
Typical 20m² patioSandstone or porcelain on a full sub-base with jointing and edging.£2,300–£5,100
Large or multi-level patioBigger areas, steps, retaining walls or premium stone.£5,100–£11,000

Expect these to shape the final quote:

  • Patio area and the amount of excavation
  • Slab material, size and laying pattern
  • Drainage needed to keep water away from the house
  • Access for materials and removing spoil

What’s included?

  • Survey of levels, damp-proof course, drainage and access
  • Excavation and removal of turf, soil or old paving
  • Compacted MOT Type 1 sub-base
  • Slabs laid on a full mortar bed with falls away from the house
  • Edging and neat cuts around drains and walls
  • Site cleared, waste removed and paving cleaned
PorcelainHard-wearing, stain-resistant slabs that stay looking clean and need little upkeep.
Indian sandstoneNatural stone with varied colours and a riven or sawn finish.
Slate or graniteDense, premium natural stone in dark or speckled tones.
Steps and raised patiosMulti-level patios with steps and retaining walls for sloping gardens.

Local housing and a new patio

Dyfed covers Carmarthenshire, Ceredigion and Pembrokeshire. Stone cottages and farmhouses under slate roofs are common, often rendered or colour-washed, as in Tenby's brightly painted terraces. Llanelli has Victorian industrial terraces, Aberystwyth and Carmarthen have Georgian and Victorian centres, and bungalows and newer estates surround most towns.

Stone homes often need lime render, repointing and roof slating repairs. Terraces suit loft conversions and extensions, and rural bungalows commonly take extensions, porches and driveways.

None of this holds for every street in Llanelli, which is why we look at your actual house before pricing a new patio rather than assuming from its age alone.

Permissions for a new patio in Llanelli

Homes in Llanelli come under the regulations for Wales, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

A ground-level patio does not usually need planning permission in Wales; raised platforms are more restricted.

Building Regulations do not normally apply, but levels and drainage must protect the house walls.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a new patio, and photograph or measure anything the quote needs to reflect.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Plan and prepare

    Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a new patio are in place before the first day on site.

  4. Build and hand over

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

What you can expect from us

Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Coverage across the UKWe take on projects in England, Wales, Scotland and Northern Ireland, and plan each one under the rules for the nation it is in.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Questions about a new patio in Llanelli

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a new patio, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

Does a patio need planning permission?

Most patios do not need planning permission, but it depends on the size, height and location, your home's position, whether it is listed or in a conservation area, and which UK nation you are in. Raised patios or decking more than a small height above the ground may need permission because of overlooking. We check the position for your garden before quoting.

How do I clean and look after my patio?

Most patios just need regular sweeping and an occasional wash with water and a mild patio cleaner. Porcelain is the easiest to keep clean. Natural stone benefits from a sealant to reduce staining and from prompt cleaning of spills like oil or wine. Re-point any joints that crack or wash out. Avoid high-pressure jet washing close to joints, which can damage them.

How long does it take to lay a patio?

Laying a typical 20m² patio takes around three to five days, from excavation and sub-base to laying, jointing and cleaning. Larger or multi-level patios with steps and walls take longer. The mortar bed needs time to set, so light foot traffic is usually fine after a day or two and furniture can go on after about a week. We confirm timings with your quote.

Near Llanelli

Coverage for Llanelli spans SA15. Close by, Gorseinon, Swansea and Ammanford are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Talk to us about a new patio

Arrange a visit to your home in Llanelli, at no charge. We'll measure up for a new patio, talk through the options and follow up with a fixed price in writing.

Call freeFree quote