A roof replacement, or re-roof, strips the old tiles or slates, battens and felt from a pitched roof and replaces them with a new breathable membrane, battens and covering, repairing timbers and renewing ridges, valleys and flashings at the same time.
Homeowners in Burnham-on-Sea usually consider a new roof for one of a few reasons: something has worn out, the house no longer suits the way they live, or they are getting it ready to sell. We visit, agree a specification and put a fixed price in writing. Most jobs like this take 1–2 weeks on site, plus scaffolding time, and we work across Somerset, including Weston-super-Mare, Bridgwater and Clevedon.
- Guide price
- £7,100–£15,500 inc VAT
- Time on site
- 1–2 weeks on site, plus scaffolding time
- Postcodes
- TA8
- Planning rules
- England
- Local area
- Somerset
- Survey
- Free, with a written quote
How much does a new roof cost in Burnham-on-Sea?
The table below shows guide prices for a new roof in Burnham-on-Sea. They are based on rates in the South West, which run about 2% above the national guide, giving an overall range of £7,100–£15,500. All figures include VAT and are firmed up after a free site survey.
| Type of job | What it usually involves | Guide in Burnham-on-Sea |
|---|---|---|
| Terraced house or bungalow | A smaller pitched roof re-covered in concrete or clay tiles, including scaffolding. | £5,100–£10,000 |
| Typical semi-detached | A 3-bed semi re-roofed in concrete or clay tiles with new membrane, battens and leadwork. | £7,100–£15,500 |
| Detached or natural slate | Larger or more complex roofs, or any roof finished in natural slate. | £12,000–£25,500 |
The main things that change the figure:
- Roof area, pitch and the number of hips, valleys and dormers
- Covering material: concrete tile, clay tile or natural slate
- Condition of rafters, fascias and other timbers
- Scaffolding, access and the height of the house
What’s included?
- Scaffolding with edge protection, erected and removed
- Stripping old tiles or slates, battens and felt in stages
- Breathable membrane and new treated battens
- New tiles or slates, or sound originals refitted where suitable
- Ridges, hips and verges dry-fixed or bedded, with new leadwork
- Waste removal by skip and a clean site on completion
Building in Burnham-on-Sea
Somerset's building stone varies widely: Bath stone in Bath, golden Ham stone around Yeovil, blue lias in villages on the Levels and Mendip stone in the north. Weston-super-Mare has Victorian villas and terraces, Taunton and Bridgwater have brick terraces and post-war estates, and new housing continues to spread around the larger towns.
The Somerset Levels are low and prone to flooding, coastal areas face Bristol Channel winds, and Exmoor is wet and exposed.
That mix of housing shapes how we approach a new roof in Burnham-on-Sea: the age and construction of your home affect the materials, the method and, in the end, the price.
Planning and building rules in Burnham-on-Sea
The notes below cover England, which is where Burnham-on-Sea sits. Rules change and every property is different, so we speak to the council before pricing your job.
Re-roofing a house with similar materials does not usually need planning permission in England. Listed buildings and conservation areas may need consent if the covering changes.
Replacing more than a quarter of a roof’s covering counts as renovation under Building Regulations, so the work is notified and the roof insulation may need upgrading. Bats are protected across the UK; if they roost under roof tiles, soffits or fascias, work stops and a licensed ecologist advises before it restarts.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
The four stages
A visit to your home
We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a new roof so the price reflects your home.
Price and scope agreed
We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.
Booking the work
Next comes planning the work itself. We set a start date that suits you, line up the right trades, and make sure any approvals for a new roof are in place before the first day on site.
On site to finish
Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.
What you can expect from us
Common questions
Will my loft insulation and ventilation be improved?
Re-roofing is a good time to improve loft ventilation and insulation. A breathable membrane and eaves or ridge vents keep air moving and reduce condensation in the loft. Building regulations may require insulation upgrades when a large part of the roof is renewed. We check your current insulation and ventilation and include any required improvements in the quote.
How long will a new roof last?
A well-installed roof lasts for decades. Concrete tiles typically last around 50 years or more, clay tiles longer, and natural slate can last a century with proper upkeep. Lifespan depends on the quality of materials, fixings, ventilation and leadwork, and on how exposed the roof is. Keeping gutters clear and fixing slipped tiles quickly helps it reach its full life.
How long will a new roof take?
On a typical home, allow 1–2 weeks on site, plus scaffolding time. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Which postcodes in Burnham-on-Sea do you cover?
We cover TA8, along with the rest of Somerset. If your postcode is not listed, get in touch anyway: our coverage is UK-wide, and we can usually arrange a survey wherever you live. Enter your postcode in the guide-price tool or contact form and we will confirm.
How long does a roof replacement take?
Re-roofing a typical semi-detached house takes around one to two weeks once scaffolding is up, depending on the roof's size, complexity and the weather. Smaller terraced roofs can take a few days. Scaffolding usually goes up a day or two before work starts and comes down once everything is inspected. We give you a programme and keep the roof weathertight overnight.
Nearby towns
We survey and quote throughout Burnham-on-Sea's TA8 postcodes and in surrounding places such as Weston-super-Mare, Bridgwater and Clevedon. The process and pricing approach are identical in each of them.