Bedfordshire · Extensions & Renovations

Single-storey extensions in Bedford

From the first visit to the final check, a single-storey extension in Bedford is planned and managed for you.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Bedford

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

We arrange a single-storey extension for homeowners in Bedford and the wider Bedfordshire. The job is planned, priced and managed by us and carried out by tradespeople engaged under our contract, so there is one agreement and one contact. On a typical home the work takes 10–16 weeks on site, and guide pricing in the East of England is £37,000–£79,000, VAT included.

Guide price
£37,000–£79,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
MK40 and MK41
Planning rules
England
Local area
Bedford Borough
Survey
Free, with a written quote

What should you budget for a single-storey extension in Bedford?

The table below shows guide prices for a single-storey extension in Bedford. They are based on rates in the East of England, which run about 5% above the national guide, giving an overall range of £37,000–£79,000. All figures include VAT and are firmed up after a free site survey.

Type of jobWhat it usually involvesGuide in Bedford
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£23,000–£42,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£37,000–£79,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£74,000–£136,000

Your price depends mostly on:

  • Floor area, shape and number of corners
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

Scope of the work

  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Bedford

Bedfordshire has a long brick-making history, and brick dominates: Victorian terraces in Bedford and Luton, interwar semis, large post-war estates around Luton and Dunstable, and newer developments near Bedford and Biggleswade. Villages in the north of the county keep limestone cottages, with timber framing and thatch scattered across older settlements.

Terraced houses here often benefit from rear extensions, loft rooms and repointing. Interwar and post-war semis commonly suit kitchen extensions, porches and garage conversions, while older village properties may call for lime plastering and sympathetic window replacements.

Building traditions across Bedfordshire also raise conservation and planning questions, so we check those for a single-storey extension in Bedford at the survey stage.

Do you need permission in Bedford?

Which rules apply depends on where you live. For Bedford, the answer is England, and the points below reflect that; we verify them with the council before quoting.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Survey and measure

    A free survey comes first. It gives us what we need to price a single-storey extension properly, including dimensions, existing materials and access for deliveries, and gives you the chance to ask anything you like.

  2. Your fixed price

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a single-storey extension.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. On site to finish

    Our trades complete a single-storey extension while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

What you can expect from us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Frequently asked questions

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Do I need planning permission in Bedford?

It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Bedford is in England, so England's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Near Bedford

Addresses in MK40 and MK41 are all covered for Bedford, along with Kempston, Ampthill and St Neots close by. Give us your postcode when you get in touch and we will confirm the details.

Talk to us about a single-storey extension

Not sure of your budget yet? Try our guide-price tool for a single-storey extension, then book a free survey in Bedford when you want a firm figure.

Call freeFree quote