County Durham · Extensions & Renovations

Single-storey extensions in Darlington

Typical time on site: 10–16 weeks on site. Guide price in Darlington: £31,500–£68,000 including VAT.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Darlington

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

Whatever prompted you to look into a single-storey extension, whether wear and tear, a growing family or plans to move, we can survey your Darlington home and give you a price in writing. Homes in the North East typically come in at £31,500–£68,000, VAT included, for this kind of work. We also cover Newton Aycliffe, Yarm and Stockton-on-Tees, and the same steps apply wherever you are in County Durham.

Guide price
£31,500–£68,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
DL1, DL2 and DL3
Planning rules
England
Local area
County Durham
Survey
Free, with a written quote

Single-storey extensions prices in Darlington

These are guide costs, not quotes. For a single-storey extension in Darlington the range is £31,500–£68,000, VAT included, reflecting prices in the North East that are about 10% below the national guide. Once we have visited for a free survey, you get a firm figure for the scope you approve.

Type of jobWhat it usually involvesGuide in Darlington
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£20,000–£36,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£31,500–£68,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£63,000–£117,000

Your price depends mostly on:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house

Scope of the work

  • Groundworks, foundations and below-ground drainage
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in Darlington

Colliery villages across County Durham are lined with brick and stone terraces, many built for mining families. Durham City has Georgian and Victorian streets, Darlington has Victorian terraces and villas, and Peterlee and Newton Aycliffe were planned as post-war new towns. Dales farmhouses in Weardale and Teesdale are stone, often under stone or slate roofs.

Colliery terraces commonly suit loft rooms, rear extensions and window replacement, and many need repointing. New-town homes often benefit from rendering or cladding upgrades and roofline renewal, while stone farmhouses may need lime work.

None of this holds for every street in Darlington, which is why we look at your actual house before pricing a single-storey extension rather than assuming from its age alone.

Planning and building rules in Darlington

Each UK nation sets its own consent rules, and Darlington is in England. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Free site survey

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for a single-storey extension so the price reflects your home.

  2. Your fixed price

    After the survey we send a quote for a single-storey extension that fixes the price for the scope we've agreed. If you want to change materials or scope, we revise it in writing before anything is booked.

  3. Booking the work

    We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.

  4. Finish and handover

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

Working with SK Home Improvements

Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Coverage across the UKWe take on projects in England, Wales, Scotland and Northern Ireland, and plan each one under the rules for the nation it is in.
Clear staged paymentsThe quote sets out when each payment falls due, linked to stages of the work, so you know in advance what is owed and when.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

What does a typical extension build look like week by week?

A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Near Darlington

We cover every part of Darlington, including DL1, DL2 and DL3, and nearby Newton Aycliffe, Yarm and Stockton-on-Tees. Wherever you are within that patch, the survey is free and the quote comes to you in writing.

Planning a single-storey extension in Darlington?

Start with a free site survey for a single-storey extension in Darlington. You'll receive a written quote showing exactly what is included and how the payments are staged.

Call freeFree quote