Warwickshire · Extensions & Renovations

Single-storey extensions in Nuneaton

Covering CV10 and CV11 and the rest of Nuneaton. Guide price £34,500–£74,000 inc VAT, confirmed after a free survey.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Nuneaton

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

If you have a single-storey extension on your list for a property in Nuneaton, we can help from the first measurements to the final clean-up. For a typical home, plan for 10–16 weeks on site, though larger or more complex jobs take longer. We cover postcodes CV10 and CV11 and nearby Bedworth, Hinckley and Earl Shilton, and every quote we send is fixed for the scope described in it.

Guide price
£34,500–£74,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
CV10 and CV11
Planning rules
England
Local area
Warwickshire
Survey
Free, with a written quote

How much does a single-storey extension cost in Nuneaton?

In Nuneaton, guide figures for a single-storey extension sit at £34,500–£74,000, VAT included. We set them using rates for the West Midlands, currently about 2% below the national guide. The table shows what pushes a project towards either end of the range; your own price is set after a free survey.

Type of jobWhat it usually involvesGuide in Nuneaton
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,500–£39,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£34,500–£74,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£69,000–£127,000

The main things that change the figure:

  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What does the job include in Nuneaton?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Homes in Warwickshire

Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.

A moderate Midlands climate, but the Avon and its tributaries flood in places, and clay soils can move in dry spells.

None of this holds for every street in Nuneaton, which is why we look at your actual house before pricing a single-storey extension rather than assuming from its age alone.

Permissions for a single-storey extension in Nuneaton

Nuneaton is in England, so the planning and building rules set out below are the ones that apply. We confirm the details with the council before we quote.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. We look at the job

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a single-storey extension, and photograph or measure anything the quote needs to reflect.

  2. Price and scope agreed

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Dates and permissions

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. On site to finish

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

Working with SK Home Improvements

Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Single-storey extensions in Nuneaton: questions

How much does a single-storey extension cost?

A typical single-storey rear extension of 15–25m² costs £34,500–£74,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

Nearby towns

We cover every part of Nuneaton, including CV10 and CV11, and nearby Bedworth, Hinckley and Earl Shilton. Wherever you are within that patch, the survey is free and the quote comes to you in writing.

Planning a single-storey extension in Nuneaton?

Request your free survey for a single-storey extension in Nuneaton. Once we've seen the property, we'll send a written price, fixed for the work as specified, with no obligation.

Call freeFree quote