Warwickshire · Extensions & Renovations

Single-storey extensions in Rugby

Single-storey extensions for homes in Rugby and nearby Daventry, Coventry and Bedworth, from survey to handover.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Rugby

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

In Rugby, as anywhere in Warwickshire, the price of a single-storey extension is driven mainly by size, materials and access. Across the West Midlands our guide sits at £34,500–£74,000 with VAT, but restricted parking, a narrow side passage or extra preparation can move the figure either way. That is why every price we give follows a visit to the house.

Guide price
£34,500–£74,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
CV21 and CV22
Planning rules
England
Local area
Warwickshire
Survey
Free, with a written quote

How much does a single-storey extension cost in Rugby?

The costs listed here are typical for a single-storey extension around Rugby and include VAT. They reflect labour and material costs in the West Midlands, about 2% below the national guide, giving a range of £34,500–£74,000. Exact pricing depends on your home, so we only fix it once a free site survey is done.

Type of jobWhat it usually involvesGuide in Rugby
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,500–£39,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£34,500–£74,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£69,000–£127,000

The main things that change the figure:

  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What does the job include in Rugby?

  • Groundworks, foundations and below-ground drainage
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Plastering, screed floor and internal doors
  • Building control inspections and completion certificate
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Local housing and a single-storey extension

Stratford-upon-Avon and Warwick have timber-framed and Georgian buildings, and Leamington Spa is known for Regency stucco terraces and villas. Nuneaton and Bedworth have brick terraces from their mining and industrial past, Rugby mixes Victorian housing with large new estates, and southern villages near the Cotswolds use limestone and blue lias.

A moderate Midlands climate, but the Avon and its tributaries flood in places, and clay soils can move in dry spells.

None of this holds for every street in Rugby, which is why we look at your actual house before pricing a single-storey extension rather than assuming from its age alone.

Permissions for a single-storey extension in Rugby

England, Wales, Scotland and Northern Ireland each handle planning a little differently. Rugby comes under England, covered below, and we raise any questions with the council before your quote is finalised.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Free site survey

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Price and scope agreed

    You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for a single-storey extension.

  3. Plan and prepare

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Build and hand over

    Our trades complete a single-storey extension while your point of contact keeps you updated. When everything is finished, we clear the site, take away waste and go through the result with you before handover.

How we work

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Questions about a single-storey extension in Rugby

How much will a single-storey extension cost in Rugby?

As a guide, expect to pay £34,500–£74,000 including VAT for a single-storey extension in Rugby. That range is adjusted for the West Midlands, which runs about 2% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Is a flat roof or a pitched roof better on an extension?

A flat roof is quicker to build and usually costs less, gives a clean modern look and works well with a roof lantern. A pitched roof matches the main house, sheds water faster and allows a vaulted ceiling, but it costs more and its height can affect neighbours. Modern flat roofs in EPDM rubber or GRP last well when properly detailed. Planning rules on height can also decide the choice.

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Near Rugby

Live in Rugby? Our coverage takes in the CV21 and CV22 postcode areas and reaches out to Daventry, Coventry and Bedworth, so homes on the outskirts and in the next town along are included.

Talk to us about a single-storey extension

Planning a single-storey extension in Rugby? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote