West Sussex · Extensions & Renovations

Single-storey extensions in East Grinstead

Local guide: £39,000–£84,000 inc VAT. Planning notes for England, a free survey and one point of contact.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in East Grinstead

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

For a homeowner in East Grinstead, planning a single-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £39,000–£84,000 including VAT, and a typical job runs to 10–16 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£39,000–£84,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
RH19
Planning rules
England
Local area
West Sussex
Survey
Free, with a written quote

How much does a single-storey extension cost in East Grinstead?

The table below shows guide prices for a single-storey extension in East Grinstead. They are based on rates in the South East, which run about 12% above the national guide, giving an overall range of £39,000–£84,000. All figures include VAT and are firmed up after a free site survey.

Type of jobWhat it usually involvesGuide in East Grinstead
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£24,500–£45,000
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£39,000–£84,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£78,000–£146,000

Your price depends mostly on:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What do you get?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

Building in East Grinstead

Chichester has Georgian brick streets, Downland villages use flint and brick, and Horsham stone slabs cover some older roofs. Worthing and Bognor Regis have interwar and post-war bungalows and semis, Crawley was planned as a post-war new town, and Wealden villages to the north feature tile-hanging and timber framing.

Bungalows commonly suit loft conversions and extensions; new-town homes often take window, roofline and cladding renewal. Flint and stone properties need lime repointing, and coastal homes may need external decorating more often.

If your house in East Grinstead fits one of these patterns, it helps us anticipate what a single-storey extension will involve, though we always confirm the details on site.

Planning and building rules in East Grinstead

Which rules apply depends on where you live. For East Grinstead, the answer is England, and the points below reflect that; we verify them with the council before quoting.

In England, many single-storey rear extensions are permitted development: typically up to 3 m deep on a semi-detached or terraced house and 4 m on a detached house, no more than 4 m high, and covering no more than half the land around the original house. Larger rear extensions can go through the prior approval process. Side extensions, flats, listed buildings, conservation areas and homes where permitted development rights have been removed need planning permission.

Building Regulations approval is needed for almost every extension, covering foundations, structure, insulation, drainage, ventilation and fire safety. If the work is on or near a shared wall or boundary, the Party Wall etc. Act 1996 may apply.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

From survey to handover

  1. Survey and measure

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a single-storey extension, and photograph or measure anything the quote needs to reflect.

  2. Price and scope agreed

    We turn the survey notes into a written quote. The price is fixed for the specification we agree, and the document sets out materials, scope and payment stages in plain language.

  3. Plan and prepare

    Preparation matters as much as the build. We agree access, parking and working hours with you, order materials in good time, and confirm any permissions so the job isn't held up once it starts.

  4. Build and hand over

    During the work we protect the areas around it and tidy up at the end of each day. Once complete, we check the finish, remove our materials and hand over paperwork such as building control sign-off where it applies.

How we work

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.

Common questions

What is the Party Wall Act and does it apply to me?

The Party Wall etc. Act 1996 applies in England and Wales only. In England and Wales, it requires you to give notice to neighbours before certain work on or near a shared wall, such as digging foundations within 3m of their building and deeper than its footings. Neighbours can agree or appoint a surveyor. Scotland and Northern Ireland have no equivalent Act, though general rights still apply. We identify whether notices are needed during the survey.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a single-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

What does a typical extension build look like week by week?

A typical single-storey extension follows the same order: clearing the site and digging foundations, building walls up to roof level, then fitting the roof and windows to make it weathertight. Electrics, plumbing, insulation and plastering follow. The last stage is opening into the house, laying the screed and fitting doors and finishes. Building control inspects at key stages, and we book those visits for you.

Nearby towns

Addresses in RH19 are all covered for East Grinstead, along with Horley, Crawley and Crowborough close by. Give us your postcode when you get in touch and we will confirm the details.

Ready for a written price?

Planning a single-storey extension in East Grinstead? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote