Wall removal is taking out an internal wall to open up rooms; where the wall is load-bearing, a steel beam sized by a structural engineer is installed on padstones to carry the weight above, with the work approved by building control.
Getting removing a wall right in Aberdeen starts with understanding the house you already have: its age, how it was built and what has been altered over the years. We survey first, then commit on paper to a price that holds as long as the scope stays the same. Across Scotland, guide prices run at £2,900–£7,700 including VAT, and homes in Nigg, Inverurie and Peterhead are covered too.
- Guide price
- £2,900–£7,700 inc VAT
- Time on site
- 1–3 weeks including making good
- Postcodes
- AB10, AB11, AB15, AB16 and AB24
- Planning rules
- Scotland
- Local area
- Aberdeen City
- Survey
- Free, with a written quote
What should you budget for removing a wall in Aberdeen?
Every figure below is a guide for removing a wall in Aberdeen, inclusive of VAT. Regional pricing for Scotland works out about 4% below the national guide, and the overall span is £2,900–£7,700. The survey costs you nothing, and after it we commit to a firm price for your specification in writing.
| Type of job | What it usually involves | Guide in Aberdeen |
|---|---|---|
| Non-load-bearing wall | Removing a stud or block partition and making good walls, ceiling and floor. | £750–£1,900 |
| Load-bearing wall up to 4m | A typical kitchen-diner knock-through with one steel beam, calculations and building control. | £2,900–£7,700 |
| Wide or complex opening | Openings over 4m, posts, flush beams or chimney breast removal. | £7,700–£15,500 |
What moves the price up or down:
- Beam size, posts, flush fixing and padstone details
- Services in the wall that need rerouting
- Floor and ceiling repairs where the wall stood
- Engineer, building control and any party wall costs
Scope of the work
- Survey to establish what the wall supports and where loads go
- Building control application and inspections
- Temporary propping and dust protection during the work
- Wall taken down and waste removed from site
- Steel beam installed on padstones and packed tight
- Beam boarded or treated for fire protection
Homes in Aberdeen and Aberdeenshire
Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.
Granite walls need repointing with a mortar matched to the stone, and slate roofs often want attention after hard winters. Harled cottages need breathable finishes, while newer estates commonly add extensions, garage conversions and driveways.
Knowing the typical building types in Aberdeen and Aberdeenshire helps, but a survey of your own home in Aberdeen is what decides the right approach to removing a wall.
Do you need permission in Aberdeen?
Each UK nation sets its own consent rules, and Aberdeen is in Scotland. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.
Removing an internal wall does not need planning permission in Scotland unless the building is listed.
Removing a load-bearing wall needs a building warrant and a structural engineer’s design. In tenement flats, the common parts and other owners’ interests also have to be considered.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
How does the job run?
We look at the job
First, someone visits your home in Aberdeen to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Your fixed price
You get the price in writing, itemised so you can see where the money goes. As long as the specification stays the same, that is the price you pay for removing a wall.
Getting ready
Once you accept, we agree start dates, order materials and deal with any planning, building control or neighbour notices the job needs. You'll know who is coming and when before work begins.
Build and hand over
On site, the agreed plan is followed and any change is put in writing first. At completion we do a final clean, go through the snagging list with you and leave you with the relevant documents.
Working with SK Home Improvements
Frequently asked questions
How do I know if a wall is load-bearing?
A wall is load-bearing if it carries weight from above, such as floor joists, another wall, the roof or a chimney. Clues include joists running across the wall rather than alongside it, and walls lined up with walls on the floor above. Brick or block walls are often structural but not always. We check from above and below during the survey, and an engineer confirms the design.
Can I have a beam that does not show?
A flush or hidden beam sits within the depth of the ceiling so there is no visible downstand, giving a clean, open look. It is possible where the floor joists can be connected into the side of the beam, which takes more steel and labour. It costs more than a standard beam below the ceiling. The engineer confirms whether it suits your house.
How long will removing a wall take?
On a typical home, allow 1–3 weeks including making good. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Do I need planning permission in Aberdeen?
It depends on the work, the size of the project, your property type and whether the building is listed or in a conservation area. Aberdeen is in Scotland, so Scotland's rules apply. Many smaller jobs need no planning application, but some still need building control approval. We check what applies to your address before quoting.
How much does it cost to remove a load-bearing wall?
Removing a load-bearing wall of about 3–4m with a steel beam typically costs £2,900–£7,700, including structural calculations, building control and making good. A non-load-bearing partition costs much less. As a rough guide, allow around £600–£1,600 per metre of opening plus fixed costs for the engineer, approvals and propping. Wider openings, posts and flush beams cost more. We confirm a fixed price after the survey.
Near Aberdeen
Our coverage in Aberdeen includes AB10, AB11, AB15 and AB16. We also travel to Nigg, Inverurie and Peterhead, so neighbouring addresses are looked after on exactly the same terms as those in town.

