County Armagh · Building Works

Wall removal and steel beams in Craigavon

Guide price £2,600–£6,900 including VAT, typically 1–3 weeks including making good, with a free site survey and a written fixed price.

Open-plan kitchen dining room after an internal wall was removed

Free survey in Craigavon

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

Wall removal is taking out an internal wall to open up rooms; where the wall is load-bearing, a steel beam sized by a structural engineer is installed on padstones to carry the weight above, with the work approved by building control.

Planning removing a wall for a home in Craigavon means making a handful of decisions about materials, layout, finish and timing. We help you work through them at a free survey, then confirm in writing what it will cost for the options you pick. Most projects of this type need 1–3 weeks including making good, and we cover every BT64, BT65 and BT66 address as well as the rest of County Armagh.

Guide price
£2,600–£6,900 inc VAT
Time on site
1–3 weeks including making good
Postcodes
BT64, BT65 and BT66
Planning rules
Northern Ireland
Local area
County Armagh
Survey
Free, with a written quote

How much does removing a wall cost in Craigavon?

What should you budget for removing a wall in Craigavon? Use the figures below as a starting point. Prices in Northern Ireland sit about 14% below the national guide, so the range here is £2,600–£6,900 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.

Type of jobWhat it usually involvesGuide in Craigavon
Non-load-bearing wallRemoving a stud or block partition and making good walls, ceiling and floor.£700–£1,700
Load-bearing wall up to 4mA typical kitchen-diner knock-through with one steel beam, calculations and building control.£2,600–£6,900
Wide or complex openingOpenings over 4m, posts, flush beams or chimney breast removal.£6,900–£14,000

What moves the price up or down:

  • Beam size, posts, flush fixing and padstone details
  • Services in the wall that need rerouting
  • Floor and ceiling repairs where the wall stood
  • Engineer, building control and any party wall costs

Scope of the work

  • Survey to establish what the wall supports and where loads go
  • Structural engineer's calculations and beam specification
  • Building control application and inspections
  • Temporary propping and dust protection during the work
  • Beam boarded or treated for fire protection
  • Plastering, flooring repairs and making good ready for decorating
Non-load-bearing partitionA stud or block wall that carries no structure, removed with simple making good.
Steel with postsWide openings that need steel posts or columns for support at intermediate points.
Chimney breast removalRemoving a chimney breast with support for the stack above by steel or brackets.
Flush or hidden beamSteel set within the ceiling depth so no downstand is visible, where joists allow.

Building in Craigavon

Armagh city has Georgian buildings, many in local limestone, around its historic centre. Portadown and Lurgan, linked by the Craigavon plan of the 1960s, have Victorian terraces, post-war estates and newer developments. The countryside is dotted with detached rural houses and bungalows, often finished in roughcast or render.

A moderate inland climate with frequent rain and winter frost, and low ground near Lough Neagh can be wet.

Knowing the typical building types in County Armagh helps, but a survey of your own home in Craigavon is what decides the right approach to removing a wall.

Do you need permission in Craigavon?

Homes in Craigavon come under the regulations for Northern Ireland, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

Removing an internal wall does not need planning permission in Northern Ireland unless the building is listed.

Structural alterations need building control approval and engineer’s calculations. There is no Party Wall Act in Northern Ireland.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

What happens after you get in touch?

  1. Free site survey

    We arrange a free site survey on a date convenient to you. We measure up, look at the existing structure and access, and discuss your plans for removing a wall so the price reflects your home.

  2. Quote in writing

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Booking the work

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Finish and handover

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Plain-English adviceWe explain options, materials and trade-offs without jargon, so you can make decisions about your home with a clear picture of what each choice means.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.
A proper handoverAt the end we clear the site, show you round the finished work and pass on documents like a building control completion certificate.

Common questions

Does the Party Wall Act apply to wall removal?

The Party Wall etc. Act 1996 applies in England and Wales only. Removing an internal wall usually does not involve it, but if the beam bears into a wall shared with a neighbour, as is common in terraced and semi-detached houses, you must serve notice first. Scotland and Northern Ireland have no equivalent Act. We tell you during the survey whether notices are needed.

Do I need building regulations approval to remove a wall?

Removing a load-bearing wall needs building regulations approval anywhere in the UK, and in Scotland a building warrant. A structural engineer calculates the beam and supports, and building control inspects the work. Removing a non-structural wall may still need approval if it affects fire escape routes, such as opening a hallway into a living room. We handle the applications and inspections.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from removing a wall, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

How long will removing a wall take?

On a typical home, allow 1–3 weeks including making good. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

What is a steel beam and why is it needed?

A steel beam, often called an RSJ, is a strong steel section installed where a load-bearing wall used to be, so the weight above is carried across the opening to the walls at each end. It sits on padstones that spread the load. The size depends on the span and the load, which a structural engineer calculates. The beam is then boxed in or plastered.

Also covering areas around Craigavon

Homes across BT64, BT65 and BT66 in Craigavon are within our coverage, as are those in Portadown, Banbridge and Armagh. If you are just outside these areas, ask anyway, because we work right across the UK.

Talk to us about removing a wall

Ready to talk about removing a wall in Craigavon? Book a free site survey and we'll send you a written, fixed-price quote for the specification you choose.

Call freeFree quote