Mid Glamorgan · Extensions & Renovations

Double-storey extensions in Aberdare

Local guide: £55,000–£110,000 inc VAT. Planning notes for Wales, a free survey and one point of contact.

Two-storey side extension on a brick semi-detached house

Free survey in Aberdare

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A double-storey extension adds two floors of new space to your house in one build, typically a larger kitchen or living room downstairs with an extra bedroom, bathroom or en-suite above, sharing one set of foundations and one roof.

From a first conversation about a double-storey extension to the day the site is cleared, homeowners in Aberdare deal with us directly. We come out to measure up at no cost, explain the choices in plain terms and send a written quote. For context, comparable work in Wales usually falls within £55,000–£110,000 including VAT, and it is available across CF44.

Guide price
£55,000–£110,000 inc VAT
Time on site
14–22 weeks on site
Postcodes
CF44
Planning rules
Wales
Local area
Rhondda Cynon Taff
Survey
Free, with a written quote

What should you budget for a double-storey extension in Aberdare?

Below is a breakdown of typical costs for a double-storey extension in Aberdare. Because rates in Wales are about 8% below the national guide, the overall guide comes to £55,000–£110,000, including VAT. Size, materials and access move the figure, and a free-of-charge survey settles it.

Type of jobWhat it usually involvesGuide in Aberdare
Small (15–20m² total)A compact rear or side extension adding a small room on each floor.£37,000–£60,000
Typical (30–40m² total)A larger kitchen or living room below with a double bedroom or en-suite above.£55,000–£110,000
Large (50m² plus total)Wide or deep extensions, often with a new bathroom, steelwork and high-spec glazing.£92,000–£166,000

The main things that change the figure:

  • Combined floor area across both storeys
  • How the new roof joins the existing roof
  • Bathrooms, en-suites and plumbing on the upper floor
  • Foundation depth, ground conditions and drains to divert

What does the job include in Aberdare?

  • Insulated cavity walls with brick or render to match the house
  • Roof structure tied into the existing roof, tiled to match
  • Scaffolding for the full build, erected and inspected
  • Electrics, plumbing and heating by qualified trades, with certificates
  • Windows, external doors, plastering and internal doors
  • Building control inspections and completion certificate
Rear two-storey extensionAdds depth at the back, often a kitchen-diner below and a bedroom above.
Side two-storey extensionUses space beside a detached or semi-detached house for a wider plan.
Over-garage extensionBuilds a new room above an existing garage, checking the foundations first.
Hipped roofA roof that slopes on every side, matching many semi-detached and detached homes.

Homes in Mid Glamorgan

The Rhondda, Cynon and Merthyr valleys are lined with stone terraces built for mining families, stepped along steep hillsides. Pontypridd, Caerphilly and Merthyr Tydfil have Victorian centres, and Bridgend has grown with large modern estates alongside interwar and post-war housing.

The valleys get heavy rainfall and steep, sloping sites are common, so drainage, retaining walls and render specification matter.

In Aberdare, as elsewhere in Mid Glamorgan, we take the building's age and construction into account before recommending anything, because both can change what is involved in a double-storey extension.

Permissions for a double-storey extension in Aberdare

For anyone in Aberdare, the relevant framework is Wales's. The summary below is general, so we always contact the council about your address before putting a price in writing.

In Wales, two-storey extensions are tightly limited under permitted development, including distance to the rear boundary, so most need planning permission.

Building Regulations approval is needed in Wales, and the Party Wall etc. Act 1996 applies to work on or near shared walls.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

The four stages

  1. A visit to your home

    First, someone visits your home in Aberdare to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Quote in writing

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Booking the work

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. The work itself

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

Why homeowners choose us

Written, fixed-price quotesYour quote states one fixed price for the work as we have specified it together, with inclusions and exclusions listed so there are no grey areas.
Permissions checked firstWe check whether planning permission or building control approval is needed for your property, and handle applications and notices where they apply.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
Certified where requiredElectrical, gas and other notifiable work is carried out by suitably registered people, and you receive the relevant certificates when it is finished.

Common questions

How long will a double-storey extension take?

On a typical home, allow 14–22 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Will the extension affect my neighbours?

A double-storey extension can affect neighbours' light, outlook and privacy, which is why planning departments look closely at height, depth and window positions. Side windows facing neighbours often need obscure glass. Work near a shared wall may also need party wall notices; the Party Wall etc. Act 1996 applies in England and Wales only. We talk through these points early so the design is realistic.

How long does a double-storey extension take?

A double-storey extension typically takes 14–22 weeks on site, depending on size, roof design and weather. Foundations and ground-floor walls come first, then the first-floor joists, upper walls and roof. Once it is weathertight, electrics, plumbing, plastering and finishes follow. Allow extra time beforehand for drawings, calculations and approvals. We give you a stage-by-stage programme with your quote.

What happens at the survey?

We visit your home at a time that suits you, look at the area involved, take measurements and check access, condition and any services that might be affected. We talk through what you want from a double-storey extension, explain the options and answer questions. There is no charge and no obligation; afterwards we send a written quote.

Is a double-storey extension better value than single-storey?

A double-storey extension usually gives better value per square metre than a single-storey one, because the same foundations and roof serve twice the floor area. The overall cost is higher, and planning can be harder because of the effect on neighbours. If you might want an extra bedroom later, building both floors now avoids a second round of disruption and scaffolding.

Nearby towns

Addresses in CF44 are all covered for Aberdare, along with Rhondda, Merthyr Tydfil and Tonypandy close by. Give us your postcode when you get in touch and we will confirm the details.

Planning a double-storey extension in Aberdare?

Planning a double-storey extension in Aberdare? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote