England · Extensions & Renovations

Whole-house renovations in East Sussex

Guide price £50,000–£134,000 including VAT across East Sussex, with a free site survey and a written fixed price.

Victorian house mid-renovation with fresh plaster and new floorboards

Free survey in East Sussex

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A whole-house renovation is a planned refurbishment of an entire home, typically combining rewiring, heating, plastering, new kitchen and bathroom, flooring and decoration, and sometimes layout changes, carried out in a logical order under one project.

Whether you live in one of the larger towns, such as Brighton, Eastbourne, Hastings and Hove, or somewhere quieter in East Sussex, the way we handle a whole-house renovation is identical. We survey, agree the specification with you, and confirm a fixed price on paper. Everything is planned under the regulations in force in England, and guide costs in the South East sit at £50,000–£134,000 with VAT.

Guide price
£50,000–£134,000 inc VAT
Time on site
8–24 weeks on site, depending on scope
Planning rules
England
Price level
About 12% above the national guide
Towns listed
12
Survey
Free, with a written quote

How much does a whole-house renovation cost in East Sussex?

Here is how the guide price for a whole-house renovation breaks down in East Sussex. We start from national figures and adjust for the South East, which comes out about 12% above the national guide. The resulting range, VAT included, is £50,000–£134,000, and a survey, at no cost to you, firms it up.

Type of jobWhat it usually involvesGuide in East Sussex
Light refurbishmentDecoration, flooring, minor repairs and perhaps one new kitchen or bathroom.£17,000–£50,000
Full refurbishmentRewire, heating, plastering, new kitchen and bathroom, flooring and decoration throughout a 3-bed house.£50,000–£134,000
Renovation with structural changesA full refurbishment plus wall removal, layout changes or extra bathrooms.£112,000–£202,000

What moves the price up or down:

  • Whether rewiring, new heating and full replastering are needed
  • Kitchen and bathroom specification
  • Structural or layout changes and associated approvals
  • Hidden problems such as damp, rot or outdated drainage

What do you get?

  • Room-by-room survey and a planned order of works
  • Strip-out of old kitchens, bathrooms, flooring and finishes
  • Rewiring and new consumer unit by qualified electricians, with certificates
  • Heating and plumbing upgrades by qualified engineers
  • New kitchen and bathroom fitted to your chosen specification
  • Flooring, internal doors, skirting and joinery
Light refurbishmentDecoration, flooring and minor repairs where wiring, heating and plaster are sound.
Full refurbishmentRewiring, heating, plastering, kitchen and bathroom, taking the house back to a fresh start.
Renovation with layout changesRemoving walls, moving the kitchen or adding an en-suite as part of the works.
Pre-sale or pre-let refreshA focused programme to get an empty property ready to sell or let.

Homes in East Sussex

Brighton and Hove are known for Regency stucco terraces and bow-fronted houses, alongside Victorian terraces climbing the hills. Lewes and Brighton have mathematical tiles and flint walls, Eastbourne has large Victorian and Edwardian villas, and Wealden villages use tile-hanging, weatherboarding and timber frames. Interwar suburbs and newer estates fill out most towns.

Regency and Victorian houses often need sash-style windows, stucco or render repair and careful decorating. Hillside terraces suit loft conversions, and flint or brick walls commonly need repointing in lime mortar.

Seafront homes face salt-laden south-westerly winds and driving rain, while Wealden clay can shrink and swell, affecting extension foundations.

Do you need permission in East Sussex?

England, Wales, Scotland and Northern Ireland each handle planning a little differently. East Sussex comes under England, covered below, and we raise any questions with the council before your quote is finalised.

Internal work such as a new kitchen, bathroom, flooring, plastering or decorating does not need planning permission in England, unless the house is listed, when listed building consent may be needed even for internal changes.

Some internal work is covered by Building Regulations: new electrical circuits and work in bathrooms (Part P), new drainage, structural changes, extractor ventilation and any new window. Notifiable work is certified by a registered installer or by building control.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Free site survey

    We begin by looking at the job in person. During the free survey we discuss options, materials and budget for a whole-house renovation, and photograph or measure anything the quote needs to reflect.

  2. Your fixed price

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Plan and prepare

    We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.

  4. On site to finish

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Tidy, protected work areasFloors, furniture and access routes are covered and protected while we work, and the site is tidied at the end of every working day.
One contract, several tradesJobs that need builders, plasterers, electricians and decorators come under a single contract, so you are not coordinating separate firms yourself.

Frequently asked questions

What contingency should I allow?

A contingency is money set aside for problems found once work starts, such as rotten joists, hidden damp or wiring that is worse than expected. For older houses, setting aside at least 10–15% of the build cost is sensible. We look for warning signs during the survey and price known issues upfront. If something unexpected is found, we explain it and price it before carrying on.

In what order should renovation work be done?

A renovation should follow a set order so finished work is never damaged by later trades. It usually runs from roof and structural repairs, through strip-out, first-fix electrics and plumbing, then plastering, second-fix electrics and plumbing, kitchen and bathroom fitting, flooring and finally decoration. Windows are usually fitted before plastering. We plan the programme around this sequence so each trade follows on smoothly.

Can you combine a whole-house renovation with other work?

Yes. Because we manage several trades under one contract, we can plan a whole-house renovation alongside other work on your East Sussex home, such as new windows with rendering, or a kitchen refit with an extension. Combining jobs can reduce repeat set-up such as scaffolding, skips and access, and every element is listed and priced in the same written quote.

Who do I deal with during the job?

One point of contact manages your project from survey to handover. They schedule the trades working under our contract, keep you updated on progress, and are the person to call with any question. You don't need to coordinate builders, electricians or decorators separately, because that is part of what we do.

Do I need planning permission to renovate?

Most internal renovation work does not need planning permission, but it depends on what changes, your home's location, whether it is listed or in a conservation area, and which UK nation you are in. Listed buildings usually need consent for internal and external changes. Altering windows, adding dormers or changing the outside appearance in a conservation area may also need permission. We check before quoting.

Towns in East Sussex

Looking for a whole-house renovation somewhere in East Sussex? Start with the towns below; each links to a page with pricing for your region and coverage details.

Planning a whole-house renovation in East Sussex?

Want to know what a whole-house renovation would cost for your house in East Sussex? Our guide-price tool gives you a range, and a free survey turns it into a written quote.

Call freeFree quote