Aberdeen and Aberdeenshire · Extensions & Renovations

Single-storey extensions in Inverurie

Single-storey extensions for homes in Inverurie and nearby Aberdeen, Nigg and Peterhead, from survey to handover.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Inverurie

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

For a homeowner in Inverurie, planning a single-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £33,500–£72,000 including VAT, and a typical job runs to 10–16 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.

Guide price
£33,500–£72,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
AB51
Planning rules
Scotland
Local area
Aberdeenshire
Survey
Free, with a written quote

Single-storey extensions prices in Inverurie

What should you budget for a single-storey extension in Inverurie? Use the figures below as a starting point. Prices in Scotland sit about 4% below the national guide, so the range here is £33,500–£72,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.

Type of jobWhat it usually involvesGuide in Inverurie
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,000–£38,500
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,500–£72,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£67,000–£125,000

The main things that change the figure:

  • Floor area, shape and number of corners
  • Roof type, rooflights, lanterns and the amount of glazing
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

What does the job include in Inverurie?

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Windows and external doors, including bifolds if chosen
  • Plastering, screed floor and internal doors
Rear extensionExtends straight out from the back of the house, often for a larger kitchen-diner.
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

What are homes like around Inverurie?

Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.

Granite walls need repointing with a mortar matched to the stone, and slate roofs often want attention after hard winters. Harled cottages need breathable finishes, while newer estates commonly add extensions, garage conversions and driveways.

If your house in Inverurie fits one of these patterns, it helps us anticipate what a single-storey extension will involve, though we always confirm the details on site.

Permissions for a single-storey extension in Inverurie

Homes in Inverurie come under the regulations for Scotland, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.

In Scotland, Class 1A permitted development covers some single-storey extensions, within limits on depth, height and distance from boundaries, and not in conservation areas or on flats. Anything outside those limits needs planning permission from the council.

A building warrant from the council’s building standards service is usually needed before work starts, and a completion certificate is accepted at the end. There is no Party Wall Act in Scotland; work near a boundary is agreed with neighbours under general law.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Survey and measure

    First, someone visits your home in Inverurie to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.

  2. Your fixed price

    The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.

  3. Plan and prepare

    We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.

  4. On site to finish

    The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.

What you can expect from us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.
Realistic timetablesWe give you an honest estimate of time on site at the quote stage and keep you informed if anything affects the programme once work starts.

Frequently asked questions

Is the price fixed?

Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.

How much does a single-storey extension cost?

A typical single-storey rear extension of 15–25m² costs £33,500–£72,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.

How long will a single-storey extension take?

On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.

Do I need planning permission for a single-storey extension?

Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Nearby towns

Coverage for Inverurie spans AB51. Close by, Aberdeen, Nigg and Peterhead are covered too, and the rest of our UK-wide area follows the same survey-then-quote process from start to finish.

Planning a single-storey extension in Inverurie?

Start with a free site survey for a single-storey extension in Inverurie. You'll receive a written quote showing exactly what is included and how the payments are staged.

Call freeFree quote