A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.
For a homeowner in Inverurie, planning a single-storey extension tends to begin with two questions: what will it cost, and how disruptive will it be? Our guide range is £33,500–£72,000 including VAT, and a typical job runs to 10–16 weeks on site. Both numbers firm up once we have seen the property, measured up and agreed exactly what is included.
- Guide price
- £33,500–£72,000 inc VAT
- Time on site
- 10–16 weeks on site
- Postcodes
- AB51
- Planning rules
- Scotland
- Local area
- Aberdeenshire
- Survey
- Free, with a written quote
Single-storey extensions prices in Inverurie
What should you budget for a single-storey extension in Inverurie? Use the figures below as a starting point. Prices in Scotland sit about 4% below the national guide, so the range here is £33,500–£72,000 including VAT. Your fixed price comes in writing once we've surveyed the property, at no charge.
| Type of job | What it usually involves | Guide in Inverurie |
|---|---|---|
| Small extension (8–12m²) | A modest rear or side extension, such as a utility room or a slightly larger kitchen. | £21,000–£38,500 |
| Typical rear extension (15–25m²) | A kitchen-diner or family room with bifold doors and a rooflight or lantern. | £33,500–£72,000 |
| Large or wrap-around (30m² plus) | A wrap-around or wide rear extension, often with structural steelwork into the house. | £67,000–£125,000 |
The main things that change the figure:
- Floor area, shape and number of corners
- Roof type, rooflights, lanterns and the amount of glazing
- Steelwork needed to open into the existing house
- Finishes, kitchen, flooring and heating specification
What does the job include in Inverurie?
- Groundworks, foundations and below-ground drainage
- Cavity walls built and insulated to building regulations
- Steel beams to open into the existing house
- Electrics and plumbing by qualified trades, with certificates
- Windows and external doors, including bifolds if chosen
- Plastering, screed floor and internal doors
What are homes like around Inverurie?
Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.
Granite walls need repointing with a mortar matched to the stone, and slate roofs often want attention after hard winters. Harled cottages need breathable finishes, while newer estates commonly add extensions, garage conversions and driveways.
If your house in Inverurie fits one of these patterns, it helps us anticipate what a single-storey extension will involve, though we always confirm the details on site.
Permissions for a single-storey extension in Inverurie
Homes in Inverurie come under the regulations for Scotland, summarised below. We don't rely on general rules alone: we confirm the position for your address with the council before a quote goes out.
In Scotland, Class 1A permitted development covers some single-storey extensions, within limits on depth, height and distance from boundaries, and not in conservation areas or on flats. Anything outside those limits needs planning permission from the council.
A building warrant from the council’s building standards service is usually needed before work starts, and a completion certificate is accepted at the end. There is no Party Wall Act in Scotland; work near a boundary is agreed with neighbours under general law.
Rules change and every property is different, so we check the planning history and constraints for your address before we quote.
How does the job run?
Survey and measure
First, someone visits your home in Inverurie to see the space, take measurements and note anything that could affect the work, such as access or the condition of what is there. There is no charge for this visit.
Your fixed price
The quote arrives in writing, not over the phone. It covers the full scope, the finishes you've chosen, any exclusions and the payment schedule, with a fixed price tied to that specification.
Plan and prepare
We handle the paperwork side: checking whether planning permission or building control approval is needed, submitting applications where they are, and scheduling the trades and materials around your dates.
On site to finish
The job proceeds in the order set out in the programme, with dust and debris kept under control. Finally we tidy away, inspect the work together and pass the finished project over to you with its paperwork.
What you can expect from us
Frequently asked questions
Is the price fixed?
Yes, for the specification we agree. Your written quote sets out exactly what is included at a fixed price. It only changes if you ask for something different, or if a problem the survey could not reasonably reveal later needs extra work. In either case we explain the change and confirm it in writing before going ahead.
How much does a single-storey extension cost?
A typical single-storey rear extension of 15–25m² costs £33,500–£72,000, built to a plastered finish ready for your kitchen and decoration. As a guide, allow roughly £1,600–£2,800 per square metre plus fixed costs for groundworks, steelwork and fees. Smaller extensions cost more per square metre. The kitchen, flooring and large glazed doors are usually the biggest extras. We confirm a fixed price for the agreed specification after the survey.
How long will a single-storey extension take?
On a typical home, allow 10–16 weeks on site. Larger projects, older buildings and extra work found once things are opened up can extend that, while simpler jobs may be shorter. Your quote includes an estimate of time on site, and your point of contact keeps you updated on the programme as the work progresses.
Do I need planning permission for a single-storey extension?
Whether you need planning permission depends on the extension's size and height, how close it is to boundaries, your home's location, whether it is listed or in a conservation area, and which UK nation you live in. In England, many rear extensions up to 3m deep on a semi or terrace, or 4m on a detached house, can be built under permitted development. We check the rules that apply to your home before quoting.
How long does a single-storey extension take to build?
A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.