Aberdeen and Aberdeenshire · Extensions & Renovations

Single-storey extensions in Nigg

Guide price £33,500–£72,000 including VAT, typically 10–16 weeks on site, with a free site survey and a written fixed price.

Single-storey rear kitchen extension with a roof lantern on a brick semi

Free survey in Nigg

Tell us about the job and we will be in touch to arrange a visit.

Prefer to talk? Call 0800 088 6341 or start a live chat.

A single-storey extension is a new ground-floor room built onto your house, usually at the rear or side, with its own foundations, walls and roof, creating a bigger kitchen, living space or bedroom without moving home.

From a first conversation about a single-storey extension to the day the site is cleared, homeowners in Nigg deal with us directly. We come out to measure up at no cost, explain the choices in plain terms and send a written quote. For context, comparable work in Scotland usually falls within £33,500–£72,000 including VAT, and it is available across AB10, AB11 and AB12.

Guide price
£33,500–£72,000 inc VAT
Time on site
10–16 weeks on site
Postcodes
AB10, AB11 and AB12
Planning rules
Scotland
Local area
Aberdeen City
Survey
Free, with a written quote

Single-storey extensions prices in Nigg

Prices for a single-storey extension vary from house to house, but in Nigg most projects fall within £33,500–£72,000 including VAT. That reflects costs in Scotland, about 4% below the national guide. Treat the table as a budgeting aid; the written figure follows a survey we carry out for free.

Type of jobWhat it usually involvesGuide in Nigg
Small extension (8–12m²)A modest rear or side extension, such as a utility room or a slightly larger kitchen.£21,000–£38,500
Typical rear extension (15–25m²)A kitchen-diner or family room with bifold doors and a rooflight or lantern.£33,500–£72,000
Large or wrap-around (30m² plus)A wrap-around or wide rear extension, often with structural steelwork into the house.£67,000–£125,000

The main things that change the figure:

  • Roof type, rooflights, lanterns and the amount of glazing
  • Ground conditions, foundation depth and drains to divert
  • Steelwork needed to open into the existing house
  • Finishes, kitchen, flooring and heating specification

Scope of the work

  • Groundworks, foundations and below-ground drainage
  • Cavity walls built and insulated to building regulations
  • Flat or pitched roof, with rooflights or a lantern if specified
  • Steel beams to open into the existing house
  • Electrics and plumbing by qualified trades, with certificates
  • Building control inspections and completion certificate
Side-return extensionFills the narrow alley beside a terrace or semi to widen the kitchen.
Wrap-around extensionCombines rear and side extensions in an L shape for the biggest open-plan space.
Flat roof with lanternA modern look, with a glazed lantern that floods the middle of the room with light.
Pitched or vaulted roofA tiled roof that matches the house, with a high vaulted ceiling inside if wanted.

What are homes like around Nigg?

Aberdeen is built largely of grey granite, from tenements and terraces to granite villas in the West End, with post-war council housing and newer estates on the outskirts. Across Aberdeenshire, harled stone cottages, fishing-town terraces in Peterhead and Fraserburgh, and modern developments in commuter towns such as Westhill and Ellon are common.

Granite walls need repointing with a mortar matched to the stone, and slate roofs often want attention after hard winters. Harled cottages need breathable finishes, while newer estates commonly add extensions, garage conversions and driveways.

With that background in mind, here is how we typically handle a single-storey extension for homes in Nigg, from the first visit to the finished result.

Permissions for a single-storey extension in Nigg

Each UK nation sets its own consent rules, and Nigg is in Scotland. What follows is a plain summary; we check the specifics for your property with the council before pricing anything.

In Scotland, Class 1A permitted development covers some single-storey extensions, within limits on depth, height and distance from boundaries, and not in conservation areas or on flats. Anything outside those limits needs planning permission from the council.

A building warrant from the council’s building standards service is usually needed before work starts, and a completion certificate is accepted at the end. There is no Party Wall Act in Scotland; work near a boundary is agreed with neighbours under general law.

Rules change and every property is different, so we check the planning history and constraints for your address before we quote.

How does the job run?

  1. Free site survey

    Book a visit and we'll come to you. The survey covers measurements, the state of what's there now and any obvious constraints, so the price that follows is based on your actual home, not an average.

  2. Quote in writing

    We put everything into a written, fixed-price quote: the specification, what's excluded, staged payments and the expected time on site. Take whatever time you need to decide; there's no pressure to commit.

  3. Booking the work

    Before anyone starts, we confirm the programme in writing, check whether consents are required and arrange deliveries. If a skip or scaffolding on the road needs a permit, we apply for it.

  4. Build and hand over

    Work goes ahead as scheduled and you deal with one contact throughout. When the last trade leaves, we clear and clean the site, talk you through what has been done and pass on any certificates and care instructions.

Why homeowners choose us

One point of contactA single named contact handles your project from the first survey to the final handover, so you always know who to call with a question.
Free site surveyWe visit your home to measure up and discuss the work at no cost, and there is no obligation to go ahead once you have our price.
Guide prices shown upfrontYou can see typical price ranges, including VAT, before you contact us, so you can judge whether a project fits your budget.
Changes agreed in writingIf something needs to change once work is under way, we explain why and confirm the cost or saving in writing before carrying on.

Questions about a single-storey extension in Nigg

How long does a single-storey extension take to build?

A single-storey extension usually takes 10–16 weeks on site, from digging foundations to final plastering. Bad weather, deep foundations or a complex roof can add time. Before work starts, allow several weeks for drawings, structural calculations and building control approval, and longer if planning permission is needed. We give you a stage-by-stage programme with your quote so you know what happens each week.

Do I need an architect for an extension?

You need proper drawings for an extension, but not always a full architect service. A designer or architectural technician can produce planning and building regulations drawings, and a structural engineer provides beam and foundation calculations. If you already have drawings, we price from them. If not, we can arrange the drawings and calculations as part of the project so everything is coordinated from the start.

Can we stay at home during the build?

Most people stay at home while we build a single-storey extension, because the new structure goes up outside before we break through. The disruptive part is usually the last few weeks, when we open into the house and fit the kitchen. We put up dust screens, keep a safe route through the house and agree a temporary kitchen setup if needed. Water and power are only off for short, planned periods.

How much will a single-storey extension cost in Nigg?

As a guide, expect to pay £33,500–£72,000 including VAT for a single-storey extension in Nigg. That range is adjusted for Scotland, which runs about 4% below the national guide. Where your project lands depends on size, materials, access and the condition of what is already there. We confirm a fixed price in writing after a free survey of your home.

Can I stay at home during the work?

In most cases, yes. Most people can live at home throughout, and we plan the work to keep disruption down by protecting floors, agreeing working hours and keeping access routes clear. Bigger jobs affecting kitchens, bathrooms or heating may mean a short spell with reduced facilities, and we talk this through with you at the survey.

Also covering areas around Nigg

Nigg and its AB10, AB11 and AB12 postcodes are part of our coverage. Homeowners in Aberdeen, Inverurie and Peterhead can also book a free survey with us and receive a written price for their job.

Ready for a written price?

Planning a single-storey extension in Nigg? Ask us to survey the property and quote in writing, or get a guide price online first using a few simple questions.

Call freeFree quote